Project overview
2A Edwin Flack Ave, Sydney Olympic Park NSW 2141
What’s happening
Homes NSW is proposing to build new social housing at 2A-4 Edwin Flack Avenue, on the corner of Birnie Avenue at Sydney Olympic Park.
The proposal includes:
- 150 social homes across two 8-storey buildings
- A public walkway connecting Osprey Park on Grazier Street and Flock Street through to Edwin Flack Avenue
- Landscaped outdoor areas
- Shared open space
- A community room
- Lifts in each building to make it easier for residents to move around
- Basement car parking and bicycle storage facilities.
The NSW Government identified the site at 2A - 4 Edwin Flack Avenue as suitable land for housing. Homes NSW purchased the site from Sydney Olympic Park Authority in June 2026 to deliver more social housing in the area.
The site is close to bus stops and Olympic Park train station, helping future residents access jobs, schools, health services and community facilities.
Future transport projects, including the Sydney Olympic Park Metro and Parramatta Light Rail, will provide more travel options once complete.
Current status
The details for the State Significant Development Application (SSDA) now on public exhibition on the NSW Department of Planning, Housing and Infrastructure (DPHI) planning portal.
You can view the application and supporting documents on the NSW Planning Portal.
Feedback will be accepted until Friday 20 November 2026.
If you have questions on this proposal, you can contact DPHI on 1300 305 695 or email information@planning.nsw.gov.au.
Contact Homes NSW
For more information or to speak to a member of the Homes NSW Community Engagement team:
- email communityengagement@homes.nsw.gov.au
- call us on 1800 738 718 and leave a message on our voicemail so we can call you back.
Frequently Asked Questions
What type of housing is proposed on this site?
If approved, the proposal would deliver 150 social homes with a mix of 1-bedroom, 2-bedroom, and 3-bedroom apartments across two 8-storey buildings.
Residents will have access to landscaped outdoor areas, shared open space, a community room, bicycle storage, and basement parking with 76 resident and visitor parking spaces.
A new active transport connection is also proposed, connecting Osprey Park on Grazier Street and Flock Street through to Edwin Flack Avenue.
Why are you building social housing in an area where there is no social housing?
Social housing is essential public infrastructure that provides safe, secure and affordable homes for people who need them most. Homes NSW is committed to delivering high-quality, modern housing that fosters community pride and reflects the dignity and respect every person deserves.
The proposed development responds to a clear and demonstrated housing need in the local area with over 2,800 households on the social housing waiting list in the Parramatta LGA, including 400 households requiring urgent housing assistance.
Sydney Olympic Park currently has no social housing despite being a major growth precinct. The delivery of 150 new social homes will help address this gap and support a more diverse, inclusive and connected community.
The proposal will be assessed through the NSW Government planning process, including detailed studies of traffic, infrastructure, servicing and environmental impacts. These technical studies will be publicly exhibited as part of the SSDA in late 2026. They have been prepared to assess the potential impacts of the proposed development and identify any measures required to mitigate and manage impacts on the surrounding area and local community.
Who will be housed on this site?
Social housing is provided to eligible households in the local government area with the greatest housing need. This includes older people, people with disability, people escaping domestic and family violence, and individuals and families on very low incomes.
Based on the current apartment mix, we expect the project to accommodate approximately 290 residents.
How was this car park identified as a potential site for social housing?
The site was identified through the NSW Government's strategic land review process as suitable for housing and it is surplus land to SOPA’s operational requirements.
Further questions on the sale of the site should be directed to SOPA at Enquiries@sopa.nsw.gov.au
How does the proposal align with the Sydney Olympic Park Master Plan 2050?
Sydney Olympic Park is a strategically significant metropolitan centre that has evolved from a major events and sporting destination into a vibrant mixed-use precinct. Under the Master Plan, which was released on 1 April 2026, SOPA identified an additional 12,400 homes within the precinct. The site at 2A-4 Edwin Flack Avenue was identified for future residential development.
The proposed development, located within walking distance to the existing train station and a future planned Metro station (currently under construction) and light rail stop is consistent with SOPA’s ambitions to create a vibrant mixed-use precinct, with an active transport link between Edwin Flack Avenue and Flock Street.
Why is additional housing being proposed before infrastructure, schools and hospitals are delivered?
The proposal forms part of the long-term growth planned for Sydney Olympic Park under the Sydney Olympic Park Master Plan 2050. The development will be assessed against existing and planned infrastructure, including transport, community facilities and services.
Questions regarding the timing and delivery of the Master Plan 2050 are best directed to SOPA, by emailing Enquiries@sopa.nsw.gov.au
Why are you demolishing the car park ahead of the SSDA approval?
Homes NSW is planning to build on the site at 2A-4 Edwin Flack Avenue pending approval.
Demolition of the existing structures will be assessed separately by Homes NSW under a Part 5 environmental assessment planning pathway.
On 24 August 2026, Part 5 notification letters about the proposed demolition were mailed out by Australia Post to 316 residential homes in the immediate area to let them know about the demolition of the existing site. The notification scope was approved by City of Parramatta Council.
This application was publicly exhibited on the NSW Planning Portal until 24 September 2026. By separating the 2 processes, this helps ensure the site is ready for construction if approval is granted.
A Part 5 assessment refers to the environmental impact assessment pathway under Part 5 of the Environmental Planning and Assessment Act 1979 (EP&A Act).
It’s important to note that demolishing the car park does not mean the project’s SSDA proposal is automatically approved. The SSDA proposal will still go through its own full assessment as a State Significant Development under the planning process with DPHI and the final design will depend on that assessment. However, if approved Homes NSW intends to build new homes on this site.
Who will deliver and manage the project?
If approved, the new homes will be delivered by Homes NSW under a design and construct contract with a builder. Once the project is complete, a Community Housing Provider (CHP) will be selected to provide dedicated management for the social housing. The CHP will be responsible for tenancy management, property maintenance and day-to-day operations. The community will be notified once a CHP has been appointed.
Will there be support services for residents?
The appointed CHP will provide on-site support services for residents, including community development programs, peer support and access to other wraparound services. These services are intended to help residents build social connections and access appropriate support, while helping to reduce demand on existing local service providers.
How are traffic, parking and transport impacts being assessed?
A Traffic Impact Assessment (TIA) is being prepared as part of the planning process. This report assesses potential impacts of the proposed development on traffic, parking, access and the surrounding road network.
The report will be submitted with the SSDA and made available during public exhibition on the DPHI website.
Is the proposed parking sufficient for Sydney Olympic Park’s high car ownership rates?
The proposal includes 76 on-site basement parking spaces, consistent with the requirements of the State Environmental Planning Policy (Housing) 2021 (Housing SEPP) and the SOPA Master Plan 2050 maximum rates.
Our data shows that many people who live in social housing do not own a car. We plan parking based on the needs of the future occupants while making the best use of the land available.
For Homes NSW developments, the car parking requirement is at a rate of 0.4 parking spaces per 1-bedroom unit, 0.5 spaces for a 2-bedroom unit and 1 space for a 3- bedroom unit. For this proposal that equals a total of around 76 car spaces.
Many social housing residents, particularly older people, have lower rates of car ownership than the broader community. This means the proposed parking provision is expected to meet the demand of the future occupants while minimising impacts on surrounding streets.
Is bicycle storage included in the development? What provisions are made for bicycles?
Yes. Secure bicycle parking and storage is proposed for residents.
Do local services (including health, schools, utilities and emergency services) have capacity to support the development?
The capacity of local infrastructure and services is assessed as part of the planning process. This includes health services, schools, utilities, transport and emergency services.
Has infrastructure capacity been assessed?
Yes. The planning process requires consultation with relevant service providers and other NSW government agencies and departments to assess impacts on infrastructure capacity and identify any required upgrades. This includes consideration of utilities and servicing infrastructure, as well as potential impacts on existing networks.
How will privacy, views and overshadowing impacts be assessed?
The proposal is 8 storeys tall, which is two storeys or 20% lower than the maximum building height allowed under the master plan and has been designed to respond to the surrounding built environment.
The lower height design was adopted to minimise overshadowing impacts and protect privacy for neighbours. A comprehensive overshadowing analysis will be undertaken as part of the SSDA to assess impacts on surrounding properties, including during mid-winter when shadows are at their greatest. You will be able to view the technical studies and provide formal feedback as part of the exhibition process. We will let you know when the SSDA is available for public feedback and submissions.
Will trees on the site be retained or removed?
An Arboricultural Impact Assessment has been prepared by a qualified arborist (tree specialist) to look at how the proposal would affect trees on or near the site and to inform the design. The design prioritises keeping significant trees where feasible.
Will the design fit in with the local streetscape?
The design has been prepared to respond to the surrounding streetscape and contribute positively to the local area, while delivering much-needed social housing. Landscaping, communal open space and tree planting are also proposed to blend the structures into the surrounding area.
How will any potential flooding and environmental impacts be managed?
Environmental impacts will be assessed and considered as part of SSDA assessment process.
A detailed technical assessment of the civil conditions, such as flooding and stormwater, will also be conducted as part of the SSDA. All recommendations will be considered in the SSDA Flood Report and Erosion and Sedimentation Control Plan.
What measures will be in place to ensure resident and community safety?
Homes NSW and the appointed CHP will work together to ensure the development is well managed and safe. The CHP will be responsible for tenancy and property management and will have processes in place to support positive community outcomes and respond to issues if they arise.
The CHP will provide a clear point of contact to tenants on site and surrounding neighbours and will have processes in place to support positive community outcomes and respond to issues if they arise.
Safety is also a key consideration in the design of the development. The proposal includes secure building access, site fencing, well-lit pathways and communal areas, clear sightlines throughout the site and CCTV monitoring of shared spaces. Landscaping and building layouts have also been designed to support natural surveillance and create safe, welcoming environments for residents and visitors.
How will construction impacts be managed?
Homes NSW acknowledges that there will be some level of disruption during the construction. However, to best plan and minimise these impacts to adjacent residents and businesses, both the Part 5 and SSDA include Traffic Management and Construction Management Plans. Following the respective planning approvals, the consent conditions will require the delivery partner to provide additional management plans to reduce noise, dust and construction impacts.
The site will be secured and managed by Homes NSW following demolition before handover to the delivery partner occurs. The management of the site, specifically security and sediment controls, will be handled as per the consent conditions.
A range of measures will be implemented to minimise disruption, including:
- working during approved construction hours only
- managing construction vehicle movements and construction traffic
- scheduling deliveries to reduce impacts on local roads
- maintaining access to surrounding properties and services
- dust and noise control measures
- providing advance notice of major works and potential impacts
- minimising construction impacts as much as possible.
How will construction traffic be managed?
A Construction Traffic Management Plan (CTMP) will be prepared prior to construction. The CTMP will set out how construction traffic, pedestrian safety and emergency access will be managed during construction. It will be prepared in consultation with relevant authorities, including Transport for NSW, City of Parramatta Council and SOPA.
Will construction impact street parking?
Construction workers will be encouraged to use public transport where possible. Construction compounds, and storage areas will also be located within the site to minimise impacts on surrounding streets.
When will demolition and construction start and finish?
Demolition of the car park is expected to commence in early 2027.
Construction is expected to commence mid to late 2027 once a contractor is on board and be completed by mid-2029.
Timeframes may change as the project progresses through the planning process.
How will any hazardous materials be managed?
All hazardous material removal will be carried out by licensed and accredited contractors in accordance with NSW regulatory requirements. Detailed safety and environmental management plans will be prepared prior to any removal works.
How will noise, dust and vibration be managed during demolition and construction?
A range of mitigation measures will be implemented to manage impacts on surrounding properties including:
- dust suppression measures such as water spraying
- covered truck loads and appropriate waste management
- noise and vibration monitoring where required
- regular maintenance of equipment
- restricted working hours.
How has the community been consulted so far?
Community consultation has included a project newsletter, project website, a community drop-in session and a preliminary engagement period for the community to provide direct feedback to Homes NSW.
On 24 August 2026, Part 5 notification letters about the proposed demolition were mailed out by Australia Post to 316 residential homes in the immediate area to let them know about the demolition of the existing site. The notification scope was approved by City of Parramatta Council.
On 20 August 2026, 1,091 newsletters were delivered to surrounding residents to provide details of the proposal and invite feedback on the proposal prior to the SSDA lodgement. This notification scope was endorsed by DPHI.
A community drop-in session was held at Yarra Community Centre, Sydney Olympic Park, on 3 September 2026, with over 80 residents attending. The feedback from this process will inform a consultation report for inclusion in the SSDA.
Residents will also have an opportunity to provide feedback once the SSDA has been put on public exhibition by DPHI, with people able to make a formal submission directly to DPHI at this time.
Will there be further opportunities for community input?
Yes. The SSDA will be placed on public exhibition on the DPHI website, and the community will be able to make formal submissions directly to DPHI during the exhibition period.
Will technical studies and assessments be publicly available?
Yes. The EIS and all technical documents submitted with the SSDA will be publicly exhibited and available on the DPHI website during the exhibition period.
Can the proposal change in response to community feedback?
Yes. Community feedback is being used to help refine the proposal and inform the planning assessment. Feedback will be documented in the Consultation Report submitted with the SSDA. Technical studies, agency feedback and community submissions may also result in changes to aspects of the design before a final determination is made by DPHI.
Will an independent design review be undertaken on the proposal?
Homes NSW has a statutory obligation for the proposed development to be reviewed by the State Design Review Panel (SDRP), with any recommendations by the SDRP to be addressed before the SSDA lodgement. The proposal has been reviewed twice, and feedback has been incorporated into the design.
