Roof plumbing - Certificate III units of competency
Course code BCP30103
For eligibility to apply for roof plumbing work, the Certificate III in Plumbing BCP30103 requires completion of stream 5 - roofing.
You can print this page to check off each unit you have completed to ensure you meet the Certificate III qualification requirements for roof plumbing.
Complete ALL compulsory units - roofing | ||
| Compulsory unit code | Compulsory unit name | Unit completed |
| BCPCM2008A | Cut and join sheet metal | |
| BCPRF2002A | Select and install roof sheeting and wall cladding | |
| BCPRF2003A | Collect and store roof water | |
| BCPRF3001A | Receive roofing materials | |
| BCPRF3002A | Fabricate and install roof drainage components | |
| BCPRF3003A | Fabricate and install external flashings | |
| BCPRF3004A | Install roof components | |
| BCPRF3005A | Install roof coverings to curved roof structures | |
| BCPRF3006A | Install composite roof systems | |
Complete 4 elective units - roofing | ||
| Elective unit code | Elective unit name | Units completed |
| BCPCM2009A | Cut with oxy-LPG/acetylene | |
| BCPRF2004A | Fabricate roof coverings for curved structures | |
| BCF2009A | Carry out load slinging of off-site materials | |
| BCGCM2003B | Install trench support | |
| BCGCM2008B | Erect and dismantle restricted height scaffolding | |
| BCGCM3001B | Operate elevated work platforms | |
| BCGRI3001B | Operate personnel and materials hoists | |
| BCGWC3006B | Install acoustic and thermal environmental protection systems | |
| MEM549AA | Perform routine gas tungsten arc welding | |
| MEM550AA | Perform routine gas metal arc welding | |
Request an accessible format of this publication.