Project overview
North Coast Local Land Services and Living Seawalls are supporting Birrigan Gargle Local Aboriginal Land Council to deliver an Indigenous-led pilot project at Yamba on Yaegl Country.
The Living Boulders project focuses on installing specially designed “Living Boulders” along the breakwall at the mouth of the Clarence River (Biirrinba) to:
- improve habitat for marine life
- reconnect cultural knowledge with the landscape.
As a pilot, this work is testing a new model for coastal habitat restoration. Learnings from this project are informing the design of a “Living Boulders 2.0”, with the aim of refining the approach and supporting future investment to deliver similar projects at a larger scale.
Project objectives
This project will:
- improve habitat for marine species along man-made breakwalls
- support biodiversity in the estuarine environment
- test an innovative approach to habitat restoration in modified coastal systems
- embed Yaegl cultural knowledge and storytelling into the site
- support monitoring to inform future large-scale restoration.
Project background
Where the Clarence River meets the Pacific Ocean at Yamba on Yaegl Country lies Biirrinba - a landscape shaped by the Dirrangun and where the Giant Eel journeys from river to sea.
Today, breakwalls define the river mouth. While they provide access for boating and recreation, they offer limited habitat for marine life and disconnect the estuary from its natural processes and cultural story. Unlike natural rockpools and complex shorelines, these flat, man-made structures provide few places for species to shelter, feed or grow, resulting in reduced biodiversity.
Creating intertidal pools and varied surfaces helps to restore ecological function in a modified coastal environment and can support species such as:
- oysters
- seaweeds
- crabs.
In addition to supporting biodiversity, these structures can contribute to improved water quality through filter-feeding species, support fish populations and play a role in adapting coastal infrastructure to changing environmental conditions.
Project delivery
Living Boulders apply eco-engineering principles to reintroduce complexity and restore habitat.
Work includes:
- supporting Birrigan Gargle Local Aboriginal Land Council and Living Seawalls to deliver an Indigenous-led pilot project
- install 20 Living Boulders to create intertidal pools and complex surfaces for marine life to improve biodiversity along the breakwall
- development of interpretive signage sharing the story of Biirrinba
- undertaking baseline biodiversity surveys of the breakwall and nearby natural rockpools.
This project reflects a broader shift in coastal management - from traditional hard infrastructure to eco-engineered solutions that support both community use and environmental outcomes.
Work underway
- Monitoring the living boulders to inform impact reporting.
- Using insights from the pilot project to inform the design of a “Living Boulders 2.0” and explore opportunities to expand the project at a larger scale.
Project updates
March 2026
Work included:
- completion of baseline biodiversity surveys to compare breakwall habitat with nearby rockpool environments
- preparation of the site for installation of Living Boulders
- installation of 20 Living Boulders along the Yamba breakwall.


Find out what's happening in the North Coast

Get the latest news, seasonal advice, and project updates or be the first to hear about upcoming events.
- Subscribe to the Monthly Update.
- Follow Local Land Services North Coast on Facebook.
- View our events page to see what's happening near you.
Project outcomes
Early learnings from this pilot include:
- the importance of integrating Indigenous cultural design elements alongside science and ecological function
- the importance of surface complexity to encourage colonisation by oysters, algae and invertebrates
- water retention and habitat use can be maximised by positioning the Living Boulders within the tidal zone
- the feasibility of retrofitting man-made coastal infrastructure to support marine ecosystems
- a scalable model for future coastal habitat restoration projects.
Funding and partnerships
This project was funded as a pilot through the NSW Fisheries Marine Estate Management Strategy (Initiative 4). Initiative 4 aims to increase the broader community’s understanding of Aboriginal Sea Country values and includes a Sea Country ranger model.
Local Land Services worked in partnership with:
- Birrigan Gargle Local Aboriginal Land Council
- Living Seawalls
- Sydney Institute of Marine Science.
Contact Local Land Services NSW
We welcome your enquiries, feedback and comments. Contact our team
Use the search function to find information or resources from Local Land Services.
