Tilba Tilba Lake and Victoria Creek rehabilitation
Local Land Services worked with landholders and key partners to reduce grazing pressures, revegetate riparian zones and support waterway and wetland habitat recovery.
The Tilba Tilba Lake and Victoria Creek rehabilitation project was delivered through the Marine Estate Management Strategy (MEMS) as a collaborative catchment-scale initiative. Local Land Services worked with partners to implement practical on-ground works to:
improve water quality
reduce grazing pressure on waterways and sensitive habitats
rehabilitate and restore riparian vegetation and condition
strengthen long-term catchment resilience by improving groundcover, stabilising streambanks, revegetating riparian areas, and improving ecosystem function.
videocam
6:58
Collaboration to address water quality issues at Tilba Tilba Lake
South East Local Land Services has worked closely with land managers, scientists from the NSW Department of Climate Change, Energy, the Environment and Water and Rangers from the Wagonga Local Aboriginal Land Council to plan, implement and monitor rest
South East Local Land Services has worked closely with land managers, scientists from the NSW Department of Climate Change, Energy, the Environment and Water and Rangers from the Wagonga Local Aboriginal Land Council to plan, implement and monitor restoration works in the Tilba Tilba Lake Catchment.
Tilba Tilba Lake is an ICOLL (Intermittently Closed and Open Lake or Lagoon) system within a predominantly grazing catchment, with approximately 65% of land cleared. Riparian vegetation, the trees and shrubs lining the fringes of waterways, is important to the health of streams and coastal lakes. Over many years, extensive riparian clearing and livestock access to Victoria Creek and Tilba Tilba Lake foreshore has caused:
erosion and streambank instability
sedimentation in creeks and the lake
algal blooms associated with elevated nutrient levels
bacterial contamination from livestock faeces washing into the waterway
Tilba Tilba Lake foreshore and Victoria Creek, the lake’s largest tributary, were identified as priority areas for rehabilitation due to their significant influence on catchment water quality and estuary health.
Project objectives
The project aimed to:
reduce sediment, nutrient, and bacterial inputs into Victoria Creek and Tilba Tilba Lake
improve riparian condition and restore degraded waterways
exclude stock from sensitive creek and estuary environments
re-establish native riparian vegetation to buffer waterways from agricultural land, improve bank stability and increase habitat connectivity
build landholder capacity in natural resource management
monitor environmental change to inform future management and demonstrate benefits of restoration.
Project timeline
2016-18:
Riparian works commenced.
Fencing works undertaken.
Riparian revegetation commenced.
2019-25:
Vegetation maintenance.
Site monitoring.
Outcomes reporting.
Project delivery
Works delivered across the catchment included:
installing stock exclusion fencing
building stock watering infrastructure
revegetation, regeneration and weed control works
establishing long-term monitoring sites
protecting lake foreshore to regenerate saltmarsh areas.
Revegetation work done at one of the sites.
Project outcomes
Since rehabilitation works began, there have been improvements in water quality and ecological condition of the waterway, supported by positive changes observed by participating landholders.
Under this project, Local Land Services:
constructed approximately 14 km of stock exclusion fencing
installed 19 off-stream watering troughs to provide clean drinking water for stock
planted approximately 15,000 native trees and shrubs to revegetate 12 ha of riparian zone
conducted weed control across 12 ha
protected lake foreshore saltmarsh areas
established long-term monitoring sites.
A program was also established to support the long-term monitoring sites to measure ecological and water quality change over time. These results will be monitored by Local Land Services' partners the Department of Climate Change, Energy, the Environment and Water (DCCEW) scientists.
Key early outcomes from this program include:
reduced faecal contamination and nutrient concentrations in Victoria Creek
Medium and long-term results will increase the health of this waterway as:
banks begin to stabilise with less erosion
macroinvertebrate communities begin to expand
nutrients continue to reduce
water clarity, fish communities and riparian vegetation continue to improve.
These results show the value of targeted riparian management in improving:
waterway health
strengthening landscape resilience
supporting more sustainable agricultural systems.
Funding and partnerships
The Tilba Tilba Lake and Victoria Creek rehabilitation project was funded through the Marine Estate Management Strategy and delivered by Local Land Services in collaboration with:
Department of Climate Change, Energy, the Environment and Water
NSW Fisheries
Wagonga Aboriginal Rangers
local contractors
participating landholders.
Contact Local Land Services NSW
We welcome your enquiries, feedback and comments. Contact our team