Mt Piper power station
Preliminary environmental site assessment
Stage 2 environmental site assessment
- Mt. Piper Power Station stage 2 environmental site assessment (PDF 1.14MB)
- Annex A: Figures (PDF 13.09MB)
- Annex B: Tables (PDF 1.96MB)
- Annex C: Refined CSM (PDF 534.2KB)
- Annex D: Borelogs (PDF 1.37MB)
- Annex E: Field documentation part 1 (PDF 23.54MB)
- Annex E: Field documentation part 2 (PDF 5.03MB)
- Annex F: Quality assurance quality control (PDF 23.78MB)
- Annex G: Photolog (PDF 1.7MB)
- Annex H: Laboratory certificates (PDF 21.26MB)
- Annex I: EIL and UCL calculations (PDF 632.7KB)
- Annex J: Survey data (PDF 550.03KB)
- Annex K: Existing well suitability (PDF 790.1KB)
Bayswater power station
Preliminary environmental site assessment
- Bayswater Power Station preliminary environmental site assessment (PDF 891.5KB)
- Annexure A: Figures (PDF 4.21MB)
- Annexure B: Photographs (PDF 1.98MB)
- Annexure C: Registered titles (PDF 411.42KB)
- Annexure D: Results of background searches (PDF 23.04MB)
- Annexure E: Dataroom documentation (PDF 3.54MB)
- Annexure F: Asbestos register (PDF 598KB)
- Annexure G: Preliminary conceptual site model (PDF 411.56KB)
- Annexure H: Data quality objectives and detailed investigation method (PDF 569.4KB)
- Annexure I: Preliminary SAQP tables (PDF 451.13KB)
Stage 2 environmental site assessment
- Bayswater Power Station stage 2 environmental site assessment (PDF 933.79KB)
- Annex A: Figures (PDF 9.96MB)
- Annex B: Tables (PDF 1.6MB)
- Annex C: Refined CSM (PDF 356.28KB)
- Annex D: Borelogs (PDF 1.84MB)
- Annex E: Field documentation part 1 (PDF 9.11MB)
- Annex E: Field documentation part 2 (PDF 18.18MB)
- Annex F: Quality assurance and quality control assessment (PDF 658.69KB)
- Annex G: Photolog (PDF 791.3KB)
- Annex H: Laboratory reports part 1 (PDF 13.94MB)
- Annex H: Laboratory reports part 2 (PDF 17.89MB)
- Annex I: EIL & UCL calculations (PDF 384.13KB)
- Annex J: Survey data (PDF 367.66KB)
- Annex K: Existing groundwater well suitability (PDF 478.66KB)
Liddell power station
Preliminary environmental site assessment
- Liddell Power Station preliminary environmental site assessment (PDF 907.03KB)
- Annex A: Figures (PDF 2.42MB)
- Annex B: Photographs (PDF 1.56MB)
- Annex C: Registered titles (PDF 401.42KB)
- Annex D: Results of background searches part 1 (PDF 23.69MB)
- Annex D: Results of background searches part 2 (PDF 2.91MB)
- Annex E: Dataroom documentation (PDF 659.03KB)
- Annex F: Asbestos register (PDF 606.83KB)
- Annex G: Preliminary conceptual site model (PDF 398.99KB)
- Annex H: Data quality objectives and detailed investigation methodology (PDF 677.21KB)
- Annex I: Preliminary SAQP tables (PDF 449.1KB)
Stage 2 Environmental site assessment
- Liddell Power Station stage 2 environmental site assessment (PDF 805.82KB)
- Appendix A: Figures (PDF 7.72MB)
- Appendix B: Tables (PDF 1.18MB)
- Appendix C: Refined conceptual site model (PDF 321.28KB)
- Appendix D: Borelogs (PDF 1.69MB)
- Appendix E: Field documentation part 1 (PDF 24.9MB)
- Appendix E: Field documentation part 2 (PDF 20.71MB)
- Appendix F: Quality assurance / Quality control assessment (PDF 525.66KB)
- Appendix G: Photographic log (PDF 774.08KB)
- Appendix H: Laboratory reports part 1 (PDF 13.46MB)
- Appendix H: Laboratory reports part 2 (PDF 14.43MB)
- Appendix I: Ecological investigation level calculations (PDF 284.28KB)
- Appendix J: Survey data (PDF 287.57KB)
- Appendix K: Existing monitoring well suitability (PDF 451.83KB)
Bayswater and Liddell power stations: Additional pre-existing contamination study
Due to the size of the documents it cannot be stored, if you would like access or have concerns related to this resource, please contact us.
Vales Point power station
Preliminary environmental site assessment
- Vales Point Power Station preliminary environmental site assessment (PDF 8.67MB)
- A Station environmental site assessment - Vales Point Power Station (PDF 3.37MB)
Stage 2 environmental site assessment
- Vales Point Power Station stage 2 environmental site assessment (PDF 1.39MB)
- Annex A: Figures (PDF 7.62MB)
- Annex B: Tables (PDF 1.64MB)
- Annex C: Refined CSM (PDF 525.68KB)
- Annex D: Borelogs (PDF 1.96MB)
- Annex E: Field documentation part 1 (PDF 14.94MB)
- Annex E: Field documentation part 2 (PDF 12.95MB)
- Annex F: QA/QC (PDF 1.13MB)
- Annex G: Photolog (PDF 1.76MB)
- Annex H: Laboratory certificates part 1 (PDF 18.34MB)
- Annex H: Laboratory certificates part 2 (PDF 24.93MB)
- Annex I: EIL and UCL calculations (PDF 718.84KB)
- Annex J: Survey data (PDF 567.77KB)
- Vales Point Power Station updated groundswater quality assessment (PDF 10.71MB)
- Vales Point additional baseline contamination assessment (PDF 8.18MB)
Eraring power station
Preliminary environmental site assessment
Stage 2 Environmental site assessment
Due to the size of the documents it cannot be stored, if you would like access or have concerns related to this resource, please contact us