Coffs Harbour bypass

Concrete pours at bridge 21 -Pine Brush Creek

For major construction, the Coffs Harbour bypass is continuing to build the bridge over Pine Brush Creek on the Pacific Highway between the Luke Bowen Pedestrian Bridge and James Small Drive (north). We have included a map showing the location of this work.

For this bridge, we have built piles, columns, headstocks and abutments and installed the precast bridge girders. The next step is pouring the concrete deck.

Top of page