Construction and site issues
We understand that construction can be disruptive, and we do everything we can to reduce the impact on our neighbours and the community wherever possible.
Protecting the health, safety and well-being of nearby residents, businesses, and construction workers is a priority throughout construction.
The New Bankstown Hospital Site News provides the latest information about work on site.
Strict measures are in place to manage noise, dust, vibration and the removal of any hazardous materials (such as asbestos) in accordance with NSW regulations and industry best practice.
Our project team works closely with contractors, environmental specialists and regulatory authorities to monitor activities, reduce impacts and respond promptly to any concerns.
We will continue to keep the community informed about upcoming works and the measures being taken to ensure construction is carried out safely and responsibly.
The New Bankstown Hospital Site News provides the latest information about work on site and a comment box so you can contact us directly about site issues.
Our contractor Hindmarsh is currently demolishing the TAFE NSW campus in stages.
Weekly updates are posted on the NSW Government Have Your Say New Bankstown Hospital Site News so you can follow the progress of the demolition and other work on site.
Main works to build the new hospital are expected to start in 2027, following the appointment of a major contractor.
Construction is expected to be completed in 2031.
This is followed by a short period to get the hospital ready for patients and visitors, also called 'commissioning'.
Traffic and parking
We know that traffic and parking are important considerations in our CBD location. More information will be provided as the project progresses.
Traffic studies are an important part of our hospital planning.
We are consulting with Transport for NSW and Canterbury Bankstown City Council about traffic planning for the new site.
This includes vehicle routes for visitors, emergency services, and deliveries, as well as the impact on the local area.
Council and Transport for NSW are also considering broader city-wide planning issues such as bus lanes and road network improvements.
More information will be provided as the project progresses.
Yes. The new hospital project includes a multi-storey car park plus additional on-ground parking to meet the needs of hospital staff and visitors.
The State Significant Development Application approved in August 2026 proposes at least 950 parking spaces for the new hospital. This is almost double the current parking capacity of around 530 spaces.
The final number will be confirmed as planning progresses and is expected to be closer to 1,000 total spaces.
Parking areas include disabled parking spaces close to entries and lifts for easy access.
Services and facilities
Services and facilities will be confirmed as the project progresses.
Staff representatives working on the design for the new Bankstown Hospital have confirmed the need for library and study space.
These facilities are expected to be located in the new Research and Education Centre.
The centre will provide a range of teaching, training and simulation experiences; the location will be confirmed as planning progresses.
However, the main library will stay at the existing Eldridge Road location due to the volume and space requirements of its physical collection.
The arrangements for loans and transfers between the two sites will be confirmed closer to the time.
Providing faith facilities for patients, visitors and staff is important to us.
These spaces are designed to be inclusive and accessible, offering a place for prayer, reflection, meditation, and quiet contemplation.
They are intended for everyone, including people of different faiths and those with no formal religious affiliation.
While these spaces play an important role in supporting well-being and spiritual care, the hospital’s primary purpose is the delivery of healthcare.
Faith spaces are therefore designed as shared facilities that can respond flexibly to the needs of patients, visitors and staff.
Before we confirm a design or layout, we consult extensively with our hospital staff and community.
We are currently speaking to our staff and pastoral care team. Consultation with community and faith leaders will follow later in the year.
The new hospital will include amenities for students including Junior Medical officers and other university students on placements.
Amenities for breaks and study will be confirmed as planning progresses but currently include a JMO lounge, and dedicated facilities for trainees to meet accreditation requirements.
Cancer services at the new Bankstown Hospital will include outpatient radiation oncology services, such as consultations with your doctors, nurses and allied health team.
These will be delivered in purpose-built clinics on levels 1 and 2 of the new hospital.
Radiation therapy treatment will continue to be delivered at other hospitals within the South Western Sydney Local Health District network e.g. Liverpool Hospital.
Sustainability
Yes, the New Bankstown Hospital will be 100% electric.
Traditionally, hospitals have relied on a combination of electricity and natural gas for heating, hot water and building services.
Electricity powers lighting, medical equipment, computers, lifts, air conditioning fans, and much of the hospital's day-to-day operations.
Natural gas is often used for heating hot water, space heating, kitchens, sterilisation equipment, and sometimes on-site energy plants known as cogeneration or trigeneration systems.
NSW Government is working to make new hospitals more sustainable by designing facilities that run entirely on electricity.
The new Bankstown Hospital is being planned as a 100% electric hospital, helping to support a cleaner, more resilient health system while meeting the needs of a growing community.
An all-electric hospital brings a range of benefits.
By reducing reliance on gas, it can:
- Lower greenhouse gas emissions
- Improve energy efficiencyEnable hospitals to take advantage of increasing amounts of renewable energy in the electricity grid
- Support the transition to renewable energy over time.
Electrified hospitals can also provide healthier indoor environments, reduce long-term operating costs, and strengthen resilience as energy systems continue to evolve.