NSW Infrastructure strategy Appendix
Government response to recommendations in the State Infrastructure Strategy 2018-2038: Building the Momentum.
No. | Recommendation | Government position |
---|---|---|
1 | Infrastructure NSW recommends that the Greater Sydney Commission lead the preparation of a place-based strategic business case for the pilot growth infrastructure compact in the Greater Parramatta to the Olympic Peninsula area by the end of 2018. (Planning: 0-5 years) | Support. The NSW Government will confirm the timing with the Greater Sydney Commission. |
2 | Infrastructure NSW recommends that, subject to the outcomes of the pilot growth infrastructure compact, the Department of Planning and Environment prepare place-based strategic business cases to inform future updates to Regional Plans and District Plans. (Planning: 0-5 years) | Support, subject to the outcomes of the pilot growth infrastructure compact. |
3 | Infrastructure NSW recommends that NSW Government agencies integrate the infrastructure priorities necessary to support Growth Areas, Planned Precincts and growth infrastructure compacts (subject to the outcomes of the growth infrastructure compact pilot) into asset management plans and capital infrastructure plans. (Policy: 0-5 years) | Support in principle. The government will further improve collaboration between agencies to identify and schedule proposed infrastructure to provide better outcomes for the community. |
4 | Infrastructure NSW recommends that the NSW Government Architect develop a ‘Movement and Place’ practitioner’s toolkit by the end of 2018 to support both Better Placed – An Integrated Design Policy for NSW’ and the Movement and Place Framework. (Policy: 0-5 years) | Support. The Government Architect will be requested to commence work and advise an appropriate timeframe. |
5 | Infrastructure NSW recommends that the Greater Sydney Commission establish a trial program to use predictive analytic tools to support the Greater Parramatta to Olympic Park growth infrastructure compact pilot by the end of 2018. (Policy: 0-5 years) | Support. Final timing will be determined by the government subject to resourcing requirements. |
6 | Infrastructure NSW recommends that the Department of Planning and Environment develop a plan by the end of 2018 for a ‘Collaborate Before You Build’ model for co-use of utility assets. (Policy: 0-5 years) | Support. Final timing will be determined by the government subject to resourcing requirements. |
7 | Infrastructure NSW recommends that the Department of Planning and Environment introduce planning rules to integrate telecommunications infrastructure (such as nodes, towers and pit and pipe infrastructure) into new developments by the end of 2018. (Policy: 0-5 years) | Support in principle. The government will undertake further work to understand the impact this recommendation would have, if any, on housing affordability and assessment timeframes and explore the best way to improve clarity for planners and industry. |
8 | Infrastructure NSW recommends that the NSW Government provide funding for a second round of the Corridor Identification and Reservation Fund. (Investment: 0-5 years) | Support in principle. The government will consider the best approach to funding corridor work going forward. |
9 | Infrastructure NSW recommends that the NSW Government continues the implementation of the reforms to Crown land and that, as part of the Land Negotiation Program, a review is undertaken by mid-2018 of the potential for Crown land to assist in meeting open space or employment objectives outlined in Regional Plans. (Policy: 0-5 years) | Support. The government expects that new Crown land management legislation will come into effect in 2018. |
10 | Infrastructure NSW recommends that the Department of Planning and Environment establish by 2020 a housing and employment supply pipeline that:
| Noted. The Department of Planning and Environment currently publishes housing supply forecasts based on known zoning and pipeline projects. The government will continue to seek ways to improve public information sharing of future population, and housing supply and employment projections. |
11 | Infrastructure NSW recommends that NSW Government agencies work together on a common timeframe to publish population and employment projections, the housing and employment supply pipeline, and agency infrastructure planning actions to coordinate the availability of key information to support Capital Infrastructure Plans and annual Budget decisions. This new common timeframe should commence in preparation for the 2019-20 Budget cycle. (Policy: 0-5 years) | Noted. The government acknowledges the importance of co-ordinated data and information sharing to inform budget decisions. We will continue to seek opportunities to improve cross-agency collaboration to further enhance decision making in the budget process. |
No. | Recommendation | Government position |
---|---|---|
12 | Infrastructure NSW recommends that the Department of Planning and Environment pursue further reforms to improve major project planning approval processes. Initial reforms should include:
| Support. The government supports the ongoing improvement of major project planning approval processes. |
13 | Infrastructure NSW recommends that the NSW Government, where possible, explore the potential for further asset recycling initiatives. (Policy: 0-5 years) | Noted. The NSW Government’s focus is now on progressing the sale of 51 per cent of a stake in Sydney Motorway Corporation. The government currently has no other asset recycling plans |
14 | Infrastructure NSW recommends that the NSW Government establish a whole-of-government process, led by Infrastructure NSW and in partnership with industry, to identify and deliver major project procurement reforms by mid-2019. The reforms should focus on driving innovation, reducing bid costs and promoting competition. (Policy: 0-5 years) | Support. |
No. | Recommendation | Government position |
---|---|---|
15 | Infrastructure NSW recommends that the NSW Government introduce a revised asset management policy that includes a new assurance model managed by Infrastructure NSW, including updated supporting policy and guidance materials, by the end of 2018. (Policy: 0-5 years) | Support. Final timing will be determined by the government subject to resourcing requirements. |
16 | Infrastructure NSW recommends that NSW Treasury update by the end of 2018 the data requirements for asset management plans prepared by agencies as inputs into NSW Treasury’s Capital Investment Planning policy. (Policy: 0-5 years) | Support. Final timing will be determined by the Government subject to resourcing requirements. |
No. | Recommendation | Government position |
---|---|---|
17 | Infrastructure NSW recommends that the NSW Government invest in initiatives to improve the collection of natural hazard information and complete the NSW Flood Data Access Program by 2020. (Policy: 0-5 years) | Support. Final timing will be determined by the government subject to resourcing requirements. |
18 | Infrastructure NSW recommends that the NSW Government nominate an agency to assume central accountability for coordinating the collection of statewide natural hazard information. (Policy: 0-5 years) | Support. |
19 | Infrastructure NSW recommends that the Department of Planning and Environment develop a Natural Hazard Policy, supported by a broader strategic process to embed resilience considerations into land use planning, by the end of 2019. (Policy: 0-5 years) | Support in principle. The government will consider the best way to embed resilience in strategic land use planning and assess the merit of a standalone policy or continued integration in land use planning processes, balancing the trade-off between resilience in infrastructure and potentially higher costs. |
20 | Infrastructure NSW recommends that the Office of Environment and Heritage and Office of Emergency Management jointly lead the development of infrastructure-specific risk assessment tools and guidance by mid-2019 to support government agencies, the private and not-for profit sectors, and local government, to better assess the vulnerabilities of new and existing infrastructure and to identify cost-effective adaption and mitigation measures. (Policy: 0-5 years) | Support. The government will develop tools and guidance material on development of the Natural Hazard Policy. Final timing will be determined by the government subject to resourcing requirements. |
21 | Infrastructure NSW recommends that NSW Treasury and Infrastructure NSW require consideration of risk to natural hazards and human-related threats and resilience outcomes for new and upgraded infrastructure in project business cases, capital asset planning and assurance processes as a matter of course. (Policy: 0-5 years) | Support. |
22 | Infrastructure NSW recommends that Roads and Maritime Services prepare business cases for evacuation road upgrade packages in the Hawkesbury-Nepean Valley by the end of 2019. (Planning: 0-5 years) | Support. |
No. | Recommendation | Government position |
---|---|---|
23 | Infrastructure NSW recommends that the Connecting Country Communities program be used to improve connectivity in regional NSW and support access to uncontended 25Mbps download and 5Mbps upload capacity by 2020 and 50Mbps download and 10Mbps upload by 2025. (Policy: 5-10 years) | Support in principle. Digital connectivity is principally a responsibility of the Commonwealth. The NSW Government will, however, continue to invest in communications infrastructure to address mobile black spots, improve emergency service communications coverage and support NBN rollout where appropriate. |
24 | Infrastructure NSW recommends that the Department of Finance, Services and Innovation lead a stock-take of all fibre networks owned or managed by the NSW Government during 2018 and establish a fibre optic cable network database. (Policy: 0-5 years) | Support. |
25 | Infrastructure NSW recommends that the Department of Finance, Services and Innovation identify opportunities to leverage NSW Government-owned telecommunications assets to improve statewide connectivity in partnership with the telecommunications industry. These assets include towers, fibre optic cable networks, and buildings, as well as expenditure on telecommunications services. (Policy: 0-5 years) | Support. |
26 | Infrastructure NSW recommends that the rollout of the Critical Communications Enhancement Program be completed and funding be provided to the NSW Telco Authority to deliver the required infrastructure. (Investment: 0-5 years) | Support in principle. The 2017-18 Budget committed an investment of $163.2 million over two years for the Critical Communications Enhancement Program, and further funding for the rollout will be considered. |
27 | Infrastructure NSW recommends that by the end of 2020 the Department of Finance, Services and Innovation develop and implement an Infrastructure Data Management Framework that incorporates access to open data, is searchable in real time and is spatially enabled to support market innovation and smart asset management with sector infrastructure experts. (Policy: 0-5 years) | Support. data.nsw.gov.au brings together a list of NSW Government datasets available in one searchable website. Some of this data is already searchable in real time and spatially enabled. The completion of the framework will be subject to resourcing needs. |
28 | Infrastructure NSW recommends that the Department of Finance, Services and Innovation lead the development of a data infrastructure ecosystem, starting with the Foundation Spatial Data Framework, to access the future benefits of digital mapping and modelling of infrastructure. (Investment: 0-5 years) | Support. Further improvements to the framework will be subject to additional analysis to inform resourcing needs. |
29 | Infrastructure NSW recommends that the Department of Finance, Services and Innovation prepare a business case for upgrading the Foundation Spatial Data Framework from a map to a model (a real-time 3D model of the physical environment). (Planning: 0-5 years) | Support. Further improvements to the framework will be subject to additional analysis to inform resourcing needs. |
30 | Infrastructure NSW recommends that the NSW Government develop a Smart Cities Strategy and program business case during 2018 to identify opportunities to deliver better services through collaboration and embracing the benefits of technology for infrastructure and public services. (Planning: 0-5 years) | Support. |
31 | Infrastructure NSW recommends that the Department of Finance, Services and Innovation lead the development of a whole-of-government policy framework to guide investment in the Internet of Things (IoT) and connected infrastructure to maximise the benefits and manage the potential risks of connected infrastructure. (Policy: 0-5 years) | Support. |
32 | Infrastructure NSW recommends that the Department of Finance, Services and Innovation leads the development of a whole-of-government policy that sets the requirements for smart technology to be embedded in all new and significantly upgraded infrastructure from 2020 onwards. (Policy: 0-5 years) | Support. |
33 | Infrastructure NSW recommends that the existing risk-based approach to information and cyber security and support is strengthened under the direction of the Government Chief Information Security Officer in 2018, with appropriate investment including whole-of-government governance and coordination. (Policy: 0-5 years) | Support. The government is currently considering the findings from the NSW Auditor General’s Report on Internal Controls and Governance (December 2017). A review of the government’s digital information security policy is currently under way, with a new strategy due to be completed in 2018. |
34 | Infrastructure NSW recommends that from 2018, cybersecurity risk assessments be included as part of the assurance process for all ICT and connected infrastructure investments, in accordance with the risk framework developed by the Department of Finance, Services and Innovation. (Policy: 0-5 years) | Support. The cybersecurity framework being developed will consider the government’s risk assessment process. |
35 | Infrastructure NSW recommends that a secure-by-design approach for new initiatives and development be adopted in accordance with standards set by the Government Chief Information Security Officer, including the IoT and connected infrastructure, and that this be included in the connected infrastructure policy framework by 2020. (Policy: 0-5 years) | Support. |
No. | Recommendation | Government position |
---|---|---|
36 | Infrastructure NSW recommends that NSW Government agencies (with NSW Treasury) assess their ability and capability to respond to the Commissioning and Contestability Policy and implement steps to separate purchaser and provider roles. (Policy: 0-5 years) | Support. |
37 | Infrastructure NSW recommends that the NSW Government continue to proactively identify and support infrastructure or related services where regulation can enable new markets and products to develop. (Policy: 0-5 years) | Support. |
38 | Infrastructure NSW recommends that NSW Government agencies apply the Commissioning and Contestability Policy to the development of long-term infrastructure strategies to enhance customer outcomes and enable closer collaboration, particularly in health, education, TAFE and justice. (Policy: 0-5 years) | Support. A key principle of the policy is that the commissioning of services should focus on improving outcomes for individuals and the community and delivering quality services. |
39 | Infrastructure NSW recommends that the Department of Family and Community Services, continue to work with NSW Government agencies to explore opportunities to embed social and affordable housing into future infrastructure projects, noting the benefits delivered by increasing the supply of social and affordable housing close to services, transport and community facilities. A ‘lessons learned’ review of existing models should be undertaken in the first quarter of 2018 and an options paper prepared for government by the end of 2018. (Policy: 0-5 years) | Support. The government will consider appropriate timings in the context of the Social Housing Strategy, committed to by the government in September 2017 as part of the response to the Independent Pricing and Regulatory Tribunal’s Review of Social and Affordable Housing Rent Models. |
No. | Recommendation | Government position |
---|---|---|
40 | Infrastructure NSW recommends that the Corridor Strategies and guidelines for submissions to the Regional Road Freight Corridor Fund, Fixing Country Roads and Bridges for the Bush programs adopt an increased focus on achieving goals related to road safety and network resilience. (Policy: 0-5 years) | Support. These programs will focus on the outcomes sought in the Future Transport Strategy, and also take a broader multi-modal perspective in line with corridor strategies, particularly in considering the role of both road and rail for passenger and freight movement. |
41 | Infrastructure NSW recommends that the NSW Government continue the Regional Road Freight Corridor Fund for a further 10 years once the current Rebuilding NSW reservation is exhausted around 2025 to overcome physical challenges and network restrictions. Investment should target freight productivity upgrades on key east-west routes linking the National Land Transport Network via a ‘top down’ strategic approach, supported by completed Corridor Strategies and business cases. (Investment: 10-20 years) | Support. The government will consider allocating further funding once the current allocation is exhausted, and in line with the strategic investment priorities and outcomes provided in Future Transport 2056. |
42 | Infrastructure NSW recommends that the NSW Government continue the Fixing Country Roads and Bridges for the Bush programs for a further 10 years once the current Rebuilding NSW reservation is exhausted around 2025 to overcome physical challenges and network restrictions. Investment should occur via a ‘top down’ strategic approach to target safety and productivity upgrades to the road network to unlock High Productivity Freight Vehicle network capacity. (Investment: 10-20 years) | Support. The government will consider allocating further funding once the current allocation is exhausted, and in line with the strategic investment priorities and outcomes provided in the Future Transport Strategy 2056. |
43 | Infrastructure NSW recommends that the NSW Government continue the Fixing Country Rail program for a further 10 years once the Rebuilding NSW reservation is exhausted around 2025 to overcome local rail system constraints. Investment should occur via a ‘top down’ strategic approach underpinned by a high-level network strategy. (Investment: 10-20 years) | Support. The government will consider allocating further funding once the current allocation is exhausted, and in line with the strategic investment priorities and outcomes provided in the Future Transport Strategy 2056. |
44 | Infrastructure NSW recommends that the NSW Government improve strategic connectivity between the Illawarra-Shoalhaven and the Western Parkland City by investing, subject to business cases, in the following projects over the next five to 10 years:
| Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
45 | Infrastructure NSW recommends that Transport for NSW develop business cases by the end of 2020 for the deployment of Smart motorway technology along the M1 Princes Motorway between Sydney and Wollongong and the M1 Pacific Motorway between Sydney and Newcastle to help manage congestion, improve network resilience and capitalise on future vehicle technologies. (Planning: 0-5 years; Investment: 5-10 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
46 | Infrastructure NSW recommends that it partner with NSW Government agencies to develop a ‘road map’ by the end of 2020 that examines the merits of, and outlines a pathway to, an integrated, system-wide user pricing regime across the Sydney metropolitan road and transport network that contemplates the impacts of electric and autonomous vehicle technology. (Policy: 0-5 years) | Noted. The government has no plans for changes to current road funding arrangements. |
47 | Infrastructure NSW recommends that Transport for NSW develop a program to reallocate and prioritise road space for on-road rapid transport links for buses and high efficiency vehicles on major routes into the Sydney CBD as major projects like WestConnex, Sydney Metro and SmartRail are completed progressively over the next five to 10 years. (Investment: 0-10 years) | Support in principle. The Future Transport Strategy 2056 includes investigations towards these initiatives. |
48 | Infrastructure NSW recommends that Transport for NSW develop business cases by the end of 2019 for the progressive delivery of a bus rapid transit network connecting the strategic centres of Liverpool, Campbelltown, Greater Penrith, Blacktown and Western Sydney Airport over the next 10 years. (Planning: 0-5 years; Investment: 0-10 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
49 | Infrastructure NSW recommends that the NSW Government continue the Easing Sydney’s Congestion program over the next 10 years with further progressive investment in targeted, small scale, high impact network management programs (such as pinch points, clearways and bus priority programs) and Co-operative Intelligent Transport Systems (such as upgrades to the Sydney Coordinated Adaptive Traffic System and Transport Management Centre). (Investment: 0-10 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
50 | Infrastructure NSW recommends that by the end of 2018, Transport for NSW develop business cases on a city-by-city basis for an annual program of investment in a network of protected cycleways linking major strategic centres across the three cities. This should be delivered in partnership with local government and be integrated with the Greater Sydney Commission Green Grid. (Planning: 0-5 years; Investment: 0-10 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
51 | Infrastructure NSW recommends that Transport for NSW, in partnership with local government, develop a 10-year rolling program that prioritises active transport at high volume and high profile locations in the Sydney CBD and other strategic centres. (Investment: 0-10 years) | Support. |
52 | Infrastructure NSW recommends that Transport for NSW complete business cases for Stage 1 and Stage 2 of the SmartRail program by the end of 2018 and 2019 respectively to enable progressive delivery of this program as a priority to provide capacity needed beyond 2021. (Planning: 0-5 years; Investment: 0-10 years) | Support. (SmartRail is now known as the More Trains, More Services program). The government will consider appropriate timings in the context of the overall investment pipeline. |
53 | Infrastructure NSW recommends that Transport for NSW complete the Sydney Metro West business case before the end of 2018 and continue to progress corridor planning and protection activities for future links in the Central River City and Western Parkland City. (Planning: 0-5 years; Investment: 5-10 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
54 | Infrastructure NSW recommends that by the end of 2018, Transport for NSW complete business cases and planning for the upgrade of major public transport interchanges at Central, Redfern and Circular Quay, and develop a program for the progressive upgrade of other major interchanges across Greater Sydney. (Planning: 0-5 years; Investment: 0-10 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
55 | Infrastructure NSW recommends that Transport for NSW develop business cases to complete the deployment of Smart motorway technology and digital infrastructure across the network in time for the expected opening of the Western Harbour Tunnel. (Planning: 0-5 years; Investment: 5-10 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
56 | Infrastructure NSW recommends that subject to completion of the business case in 2018, the NSW Government invest in the Western Harbour Tunnel to complete a Western CBD Bypass and inner urban motorway network. (Planning: 0-5 years; Investment: 5-10 years) | Support. The government has committed to completing this work by mid-2018. |
57 | Infrastructure NSW recommends that Transport for NSW complete the business case for the Western Sydney Airport motorway for delivery in time for opening of the Western Sydney Airport. Corridor planning and protection for future strategic road links in the Western Parkland City and to the Illawarra-Shoalhaven should continue to be progressed. (Planning: 0-5 years; Investment: 5-10 years) | Support. Development of the M12 motorway is underway with the corridor announced in February 2018. |
58 | Infrastructure NSW recommends that Transport for NSW lead the development of a bulk materials transport and handling plan for Greater Sydney by the end of 2019 to support the construction and waste management sectors. (Policy: 0-5 years) | Support. The NSW Government will begin the development of a High Productivity Vehicle network plan that covers the needs of these and other sectors. Final timing will be determined by the Government subject to resourcing requirements. |
59 | Infrastructure NSW recommends that the Department of Planning and Environment update the relevant State Environmental Planning Policies by the end of 2019 to further protect strategically important ports, airports, industrial lands, freight precincts and key corridors from incompatible uses to ensure the efficient movement of freight in Sydney and NSW, now and into the future. (Policy: 0-5 years) | Support. |
60 | Infrastructure NSW recommends that Transport for NSW finalise business cases by the end of 2018 to enable the NSW Government to partner with the Commonwealth Government to fund investment in Sydney Gateway, Port Botany Rail Duplication and Foreshore Road/Botany Road, as well as the Moorebank Intermodal Terminal Road Access Strategy, to remove bottlenecks on connections to and from Sydney Airport and Port Botany and to capitalise on development of the Moorebank Intermodal Terminal. (Planning: 0-5 years; Investment: 0-5 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline, and where appropriate in consultation with the Commonwealth. |
61 | Infrastructure NSW recommends that, by the end of 2018, Transport for NSW develop business cases for on-road rapid transit and priority infrastructure that caters for buses and high efficiency vehicles on Parramatta Road and Victoria Road in support of the Sydney Metro West project. (Planning: 0-5 years; Investment: 0-10 years) | Support in principle. Business cases will explore public transport options to service Parramatta Road and Victoria Road transport corridors on a mode neutral basis. The government will consider appropriate timings in the context of the overall investment pipeline. |
62 | Infrastructure NSW recommends that Transport for NSW develop business cases by the end of 2019 for staged investment in on-road rapid transport links for buses and high efficiency vehicles on key corridors at the periphery of the Sydney CBD over the next five to 10 years. (Planning: 0-5 years; Investment: 5-10 years) | Support in principle. Multi-modal business cases would consider whether reallocating road space and prioritising movements for these services will enable people and goods to move more effectively than would otherwise be the case. The government will consider appropriate timings in the context of the overall investment pipeline. |
63 | Infrastructure NSW recommends that Transport for NSW develop a business case by the end of 2019 to augment the capacity and productivity of the Liverpool to Parramatta and North West T-Ways with additional services, enhanced signal priority and a Wentworthville T-Way-to-T-Way connection to link the two separate networks. (Planning: 0-5 years; Investment: 0-5 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
64 | Infrastructure NSW recommends that Transport for NSW develop a business case by the end of 2019 to establish an outer Parramatta ring road bypass to protect the Parramatta CBD from traffic intrusion. (Planning: 0-5 years; Investment: 5-10 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
65 | Infrastructure NSW recommends that Transport for NSW develop business cases by the end of 2019 for the progressive upgrade of key north-south arterials between the M2 and the M5 to Smart road facilities to improve connectivity, safety and reliability. (Planning: 0-5 years; Investment: 5-10 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
66 | Infrastructure NSW recommends that Transport for NSW develop business cases by the end of 2019 for investment in on-road rapid transit links for buses and high efficiency vehicles between Greater Parramatta and surrounding strategic centres such as Bankstown, Hurstville, Kogarah and Macquarie Park. (Planning: 0-5 years; Investment: 5-10 years) | Support in principle. Business cases will explore public transport options to service these corridors on a mode neutral basis. The government will consider appropriate timings in the context of the overall investment pipeline. |
67 | Infrastructure NSW recommends that Transport for NSW develop the business case for Stage 2 of Parramatta Light Rail project by the end of 2018 to enable the NSW Government to make an informed investment decision on the project. (Planning: 0-5 years; Investment: 0-10 years | Support. The government has already committed to completing this work by the end of 2018. |
68 | Infrastructure NSW recommends that by the end of 2018, Transport for NSW and the Greater Sydney Commission develop a Greater Parramatta Access Plan leading to a strategic business case for a program of works under the pilot growth infrastructure compact. (Planning: 0-5 years; Investment: 0-20 years) | Support. |
69 | Infrastructure NSW recommends that the NSW Government plan and protect the corridors and precincts necessary for future transport, freight, logistics, energy and communications facilities and infrastructure in the Western Parkland City. (Policy: 0-5 years) | Support. |
70 | Infrastructure NSW recommends the NSW Government partner with the Commonwealth Government to plan the staged investment in mass transit to support the Western Parkland City over the period from 2036 to 2056. (Planning: 0-5 years; Investment: 20-40 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline, potential Commonwealth investment, and findings of any business case work. |
71 | Infrastructure NSW recommends that investment in rapid, express rail services to Western Sydney Airport be considered only as a long-term proposition when an expected step-change in airport patronage occurs. (Planning: 0-5 years; Investment: 20-40 years) | Noted. The government will consider appropriate timings in the context of the overall investment pipeline, potential Commonwealth investment, and findings of any business case work. |
Energy
No. | Recommendation | Government position |
---|---|---|
72 | Infrastructure NSW recommends that the NSW Government implement the COAG Energy Council endorsed recommendations and, through leadership and close monitoring, ensure that actions taken by the energy market closely reflect the specific needs and circumstances of NSW energy consumers. (Policy: 0-5 years) | Support. The NSW Government will continue to work with other governments to ensure actions recommended to the national energy market reflect the needs of NSW energy consumers. |
73 | Infrastructure NSW recommends that the NSW Government avoid funding new generation capacity or introducing schemes that send distortionary price signals that prevent private sector investment. (Policy: 0-5 years) | Noted. The government supports appropriate private sector led investment in energy generation. |
74 | Infrastructure NSW recommends that the NSW Government undertake a review of the benefits of transitioning the existing State-based transmission and distribution reliability standards to a national framework administered by the Australian Energy Regulator. The review should be undertaken by mid-2020 prior to a further review of Regulatory Investment Tests, to be commissioned by the COAG Energy Council. (Policy: 0-5 years) | Support. The government will consider the timing and scope of the proposed review. This will be informed by the COAG Energy Council’s existing work on integrated grid planning. |
75 | Infrastructure NSW recommends that by mid-2018, the Department of Planning and Environment accelerate the competitive release of exploration areas, in accordance with the NSW Government’s Strategic Release Framework for Coal and Petroleum Exploration. (Policy: 0-5 years) | Noted. Assessments for release under the framework are considered by the Advisory Body for Strategic Release, who in turn make a recommendation to the NSW Minister for Resources. |
76 | Infrastructure NSW recommends that during 2018, the Department of Planning and Environment review local planning rules and the electricity supply regulatory framework to enable new technologies and energy infrastructure and other solutions including vehicle charging. This includes using regulatory trials to determine whether these solutions are eligible to be complying developments. (Policy: 0-5 years) | Support. In late 2017 the NSW Government consulted with stakeholders to obtain information that will be used to inform a future policy and regulatory response to emerging energy delivery models and new technology. |
77 | Infrastructure NSW recommends that by the end of 2019 the Department of Planning and Environment accelerate national and state regulations for consumer protection and safety requirements for new energy technologies. (Policy: 0-5 years) | Support. In late 2017 the NSW Government consulted with stakeholders on whether the consumer protection frameworks in NSW are meeting the changing needs of energy customers. The government is now considering whether, and what type of regulatory reform may be needed in NSW to support the energy market transformation. |
78 | Infrastructure NSW recommends that the NSW Government continue to use the Climate Change Fund to deploy demand management and new energy technologies. (Policy: 0-5 years) | Noted. The NSW Government has co-funded a new $14 million demand response initiative with the Australian Renewable Energy Agency and the Australian Energy Market Operator. The three-year trial will free up to 80 megawatts of supply across the state when we need it most (the equivalent capacity of 16,000 rooftop solar systems) |
79 | Infrastructure NSW recommends that the NSW Government focus existing mechanisms, such as the Regional Economic Growth program, on supporting skills development and jobs for industries affected by the energy transition. (Policy: 0-5 years) | Support. The government has invested in a number of funds to support regional growth and skills development. |
80 | Infrastructure NSW recommends that by mid-2019 the Department of Planning and Environment further strengthen the regulated energy efficiency standards for retail, commercial and multi-use developments and infrastructure developments. (Policy: 0-5 years) | Support. Improved energy performance standards for new commercial buildings are already being developed for implementation nationally in 2019 as part of the National Energy Productivity Plan. |
81 | Infrastructure NSW recommends that by the end of 2018, the Office of Environment and Heritage develop an updated NSW Government Resource Efficiency Policy with targets and minimum standards for demand management and energy efficient measures to ensure compliance across all agencies. (Policy: 0-5 years) | Support. A review of the Government Resource Efficiency Policy is currently underway. |
No. | Recommendation | Government position |
---|---|---|
82 | Infrastructure NSW recommends that the NSW Government assesses the climate science capability it requires for water resource management and infrastructure investment decision-making and act to meet its requirements by mid-2019. (Policy: 0-5 years) | Support. |
83 | Infrastructure NSW recommends that by early 2019, the NSW Government publish a NSW Water Statement to set out the current over-arching policy context, targets and strategic outcomes for the allocation, conservation, management and control of water resources to meet the challenges of climate change and population growth, and ensure a prosperous economy. (Policy: 0-5 years) | Support. Final timing will be determined by the government, subject to resourcing requirements. |
84 | Infrastructure NSW recommends that the NSW Government commence the development of regional water strategies for all catchments by early 2019 to underpin the proposed NSW Water Statement. (Policy: 0-5 years) | Support. The NSW Government has a statutory commitment to deliver Water Resource Plans prior to July 2019. The Water Resource Plans are a major input to the regional water strategies, and therefore regional water strategies for non-priority catchments will be developed following delivery of Water Resource Plans. |
85 | Infrastructure NSW recommends that by the end of 2018, the Department of Industry and Water NSW complete the development of regional water strategies that identify investment priorities and other policy options in the priority catchments of Gwydir and Macquarie. (Policy: 0-5 years) | Support. The government has commenced work on developing regional water strategies for the Gwydir and Macquarie catchments. |
86 | Infrastructure NSW recommends that by early 2019, the Department of Industry, in consultation with relevant water service providers, develop regional water strategies for the Richmond and Bega priority catchments. (Policy: 0-5 years) | Support. Bega and Richmond catchments have been identified as high priority through the Catchment Needs Assessment. Subject to available resources, work will commence on developing these strategies in 2018. |
87 | Infrastructure NSW recommends that the Department of Industry, in consultation with NSW Health, develop a risk-based approach by early 2018 to identify priority infrastructure projects that protect drinking water safety in regional NSW towns. (Policy: 0-5 years) | Support. NSW Health and the Department of Industry are working on jointly developing a methodology for risk-based prioritisation of water infrastructure needs across the State. Final timing will be determined by the government, subject to resourcing requirements. |
88 | Infrastructure NSW recommends that the Department of Industry finalise the Hunter regional water strategy by early 2018 to achieve longer-term water security for the region, including the Central Coast. (Policy: 0-5 years) | Support. The government is developing the Hunter Regional Water Strategy, which is due for completion in 2018. |
89 | Infrastructure NSW recommends that the Department of Industry review water-sharing arrangements by early 2019 to enable an informed response to the closure of power generation plants in the Hunter region. (Policy: 0-5 years) | Support. Subject to available resources, work will commence on this review in 2018. |
90 | Infrastructure NSW recommends that by early 2019, Water NSW prepare a strategic business case for the option of connecting Lostock and Glennies Creek dams. (Planning: 0-5 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
91 | Infrastructure NSW recommends that by early 2019, Hunter Water prepare a strategic business case for the option of constructing a potable water pipeline to Singleton, connecting to the Hunter Water network. (Planning: 0-5 years) | Support. The government will consider appropriate timings in the context of the overall investment pipeline. |
92 | Infrastructure NSW recommends that Sydney Water develop a 20-year Strategic Capital Plan for Sydney’s water and waste water systems by early 2019 for consideration by the NSW Government and inclusion in its Pricing Submission to the Independent Pricing and Regulatory Tribunal due in mid-2019. (Policy: 0-5 years) | Support. The government supports Sydney Water, in partnership with Water NSW, developing a long-term capital plan for the consideration of government and IPART. |
93 | Infrastructure NSW recommends the completion of the South Creek Corridor Strategic Business Case by late 2018. (Planning: 0-5 years) | Support. The government has commenced work on the South West Creek Structure Plan. |
94 | Infrastructure NSW recommends that Water NSW and Sydney Water consider a portfolio of options for the augmentation of Sydney’s water supply, including the findings of the South Creek Strategic Business Case, and provide advice to the NSW Government for its consideration by early 2019. (Planning: 0-5 years) | Support. The NSW Government will consider this advice alongside the 20-year Strategic Capital Plan. |
No. | Recommendation | Government position |
---|---|---|
95 | Infrastructure NSW recommends that the NSW Government continue the high-level of investment in fit-for-purpose health infrastructure over the 10-year period from 2018 to 2028. (Investment: 0-10 years) | Support. Future levels of investment in health infrastructure will be assessed alongside other Government priorities as part of the budget process. |
96 | Infrastructure NSW recommends that NSW Health develop a 20-year Health Infrastructure Strategy by early 2019 that supports the future delivery of health services and includes:
| Support. The government will also investigate Rouse Hill among the sites for future health facilities where new development is expected. |
97 | Infrastructure NSW recommends that NSW Health continue to deliver the NSW eHealth Strategy 2016-2026, including full delivery of eHealth Integrated Digital Patient Records and the eHealth whole-of-system digital platform. (Policy: 0-5 years) | Support. The 2017-18 Budget provided funding for NSW Health to deliver eHealth integrated digital patient records and a whole of system digital platform. |
98 | Infrastructure NSW recommends that NSW Health periodically refresh the eHealth strategy to:
| Support. |
99 | Infrastructure NSW recommends that the NSW Government increase investment in walking and cycling infrastructure and parks and open spaces as part of the ongoing integration of health into land use planning and transport strategies. (Investment: 0-5 years) | Support. |
No. | Recommendation | Government position |
---|---|---|
100 | Infrastructure NSW recommends that the NSW Government fully fund and implement the School Assets Strategic Plan. (Investment: 0-20 years) | Support. To ensure the School Asset Strategic Plan is fit for purpose, the government will complete the Schools Community Planning Program prior to updating the strategic plan. |
101 | Infrastructure NSW recommends that the Department of Education develop and implement a comprehensive School Assets Strategic Plan program management and reporting framework by the end of 2018. (Policy: 0-5 years) | Support. The NSW Government has established ‘School Infrastructure NSW’ which will provide professional program management of the overall infrastructure program. The government has also appointed a School Infrastructure NSW Advisory Council, and information on the status of assets and planned school projects is now published on the School Infrastructure NSW website. |
102 | Infrastructure NSW recommends that the Department of Education establish a consultation framework by the end of 2018 that ensures consideration of community views and whole-of-government and place-based outcomes in the delivery of new and upgraded schools. (Policy: 0-5 years) | Support. |
103 | Infrastructure NSW recommends that the Department of Education develop a program to progressively convert all existing permanent learning spaces to Future Learning environments over the long term. (Investment: 0-40 years) | Support in principle. This recommendation will be implemented on an as-needed basis through business cases to ensure project proposals are worthwhile and appropriate. |
104 | Infrastructure NSW recommends that in its next review of the School Assets Strategic Plan, the Department of Education:
| Support. The NSW Government has already undertaken to review and consider options to amend operational policies and practices, to reduce infrastructure requirements as part of the response to the NSW Auditor General’s report, Performance Audit Report on Planning for School Infrastructure (May 2017). |
105 | Infrastructure NSW recommends that the Schools Community Planning process routinely consider:
| Support. |
106 | Infrastructure NSW recommends that the Department of Education prepare a School Energy Strategy (2018 – 2030) by mid-2018. (Policy: 0-5 years) | Support. Current school infrastructure planning has a strong focus on energy provision and efficiency. A broader School Energy Strategy will be developed during 2018. |
107 | Infrastructure NSW recommends that the Department of Education prepare a Schools Digital Transformation Strategy (2018-2025) in partnership with the Department of Finance, Services and Innovation by the end of 2018. (Policy: 0-5 years) | Support. The NSW Government has published and is implementing the Department of Education’s Strategic Information Plan 2016-19. A Digital Transformation Strategy will be developed to take effect after the current plan expires. |
108 | Infrastructure NSW recommends that the Department of Education prepare a business case by mid-2018 for a Connecting Metropolitan Schools program to improve digital connectivity in metropolitan schools. (Planning: 0-5 years) | Support. The government will consider appropriate timing for a business case in the context of broader plans to improve digital connectivity across NSW schools. |
109 | Department of Education support the non-government school sector to meet its growth challenges and to identify and, where possible, remove barriers to that sector growing its student share. (Policy: 0-5 years) | Support. The government will continue to provide support to the non-government school sector through the Building Grants Assistance Scheme. |
110 | Infrastructure NSW recommends that the Department of Education facilitate joint and shared use arrangements by:
| Support. |
111 | Infrastructure NSW recommends that TAFE NSW prepare a 20-year TAFE NSW Infrastructure Strategy by the first quarter of 2019, which considers:
| Support. The government will consider appropriate timing of an infrastructure strategy in the context of the larger TAFE modernisation reform agenda. |
No. | Recommendation | Government position |
---|---|---|
112 | Infrastructure NSW recommends that the Department of Justice undertake a review of asset management across the Justice Cluster. The review should be completed by mid-2018 and include:
| Support. This work will commence in 2018 as a priority, with final timing subject to resourcing requirements. |
113 | Infrastructure NSW recommends that the Department of Justice prepare a long-term 20-year Justice Infrastructure Strategy. The Strategy, to be informed by the asset management review, should be completed by the first quarter of 2019. (Policy: 0-5 years) | Support. Final timing will be determined by the government subject to resourcing requirements. |
114 | Infrastructure NSW recommends that by the end of 2018, the Department of Justice prepares business cases to address court capacity in the Sydney CBD, South West Sydney and key locations in regional NSW. (Planning: 0-5 years; Investment: 5-10 years) | Support. Final timing will be determined by the government subject to resourcing requirements. |
115 | Infrastructure NSW recommends that the Department of Justice prepare a business case and undertake site investigations and related community consultation by the end of 2018 to address the requirement for additional long-term prison bed capacity in Greater Sydney. (Planning: 0-5 years; Investment: 0-10 years) | Support in principle. The government will continue to consider the need for additional long-term prison bed capacity across the state. Final timing will be determined by the government subject to resourcing requirements. |
No. | Recommendation | Government position |
---|---|---|
116 | Infrastructure NSW recommends that, following appropriate consultation, the NSW Government publish its response to the recommendations of the 2016 Cultural Infrastructure Strategy. (Policy: 0-5 years) | Support. |
117 | Infrastructure NSW recommends that by mid- 2018, the Office of Sport complete a Sport Infrastructure Strategy, a whole-of-sector, evidence-based investment framework and management plan. (Policy: 0-5 years). | Support. In terms of timing, the government will allow sufficient time to ensure the delivery of a robust and comprehensive strategy. |
118 | Infrastructure NSW recommends that the Office of Sport:
| Support. |
119 | Infrastructure NSW recommends that by the end of 2018, the NSW Government develop a Tourism Infrastructure Strategy and whole-of-sector, evidence-based investment framework to guide investment in state-owned tourism and nature-based scientific, education, recreation and entertainment facilities. (Policy: 0-5 years) | Support. The government is currently undertaking a mid-term review of the Visitor Economy Industry Action Plan, with an industry-led Visitor Economy Taskforce. |
120 | Infrastructure NSW recommends that the NSW Government prepare strategic business cases by the end of 2018 for:
| Support. The NSW Government is currently finalising the Cruise Development Plan. In terms of Circular Quay, business case timing will be determined by the government subject to consultation to be undertaken. |
121 | Infrastructure NSW recommends that the NSW Government continue the Regional Growth, Environment and Tourism Fund for a further 10 years once the current Rebuilding NSW reservation is exhausted around 2023. (Investment 5-10 years) | Support. The government will consider allocating further funding once the current allocation is exhausted. |
122 | Infrastructure NSW recommends that concurrent with the update to the Sydney Airport Master Plan in 2019, the NSW Government encourage the Commonwealth Government and Sydney Airport to conduct a review of regulatory settings to improve operation in the period preceding the opening of Western Sydney Airport. (Policy: 0-5 years) | Noted. Sydney Airport Corporation Limited has engaged with the NSW Government on the review of the airport’s master plan. |