Active Transport in Winmalee and Yellow Rock Project

Bike path along a grassy hill.

About the Project

The Blue Mountains Active Transport Links Project will deliver 3.8 kilometres of active transport footpath and shared path as part of the Great Blue Mountains Trail. The project will provide tangible improvements to active transport infrastructure to promote active transport as a viable travel mode alternative to private car use.

Project Scope

  • 3.8 km off-road shared pathway along Singles Ridge Road, Yellow Rock, between Vendetta Road and Yellow Rock Road with drainage and landscaping as required and indicated in final design
  • Roadside barriers and kerb to separate traffic and path users as required and indicated in final design
  • Traffic calming and traffic control devices as required and indicated in final design to ensure safety for path users
  • Stormwater improvements or adjustments as required and indicated in final design
  • Bus stop upgrade
  • Balustrades as required and indicated in final design

Project Status

Construction in progress

Fast Facts

Funding:

NSW Government Funding: $2,600,000.00

TOTAL PROJECT VALUE: $2,600,000.00

Aboriginal Lands:

Darug

Focus Area:

Local traffic programs