Key information
- Status: Closed
- Grant amount: Up to $200,000
- Application opened: 8 April 2026
- Application closed: 20 May 2026, 5:00 pm
Program objective
Minor works submitted for funding will need to demonstrate an improvement to level crossing safety, in line with the eligible works permitted and outlined in the guidelines.
Ensuring projects deliver works towards improvements to safety around crossings which aligns with the LeveI Crossing Strategy - Council Strategic Plan 2021-2030 to prioritise the reduction of collisions and near misses at level crossings, Towards Zero.
This program is administered by Transport for NSW.
Eligibility
Who can apply
Only public level crossings in regional NSW are eligible for funding. This includes Newcastle, Central Coast and Wollongong. Please see Attachment A in the Program Guidelines for a full list of eligible Councils.
Who the grant is targeted towards
Transport is seeking applications from councils for safety improvement projects that can be developed and delivered by councils (or council sub-contractors) on council-managed roads.
Types of projects funded under this grant
- rectification of defects identified during an ALCAM assessment
- remediation of the level crossing surrounds to increase sighting distances, including permanent removal of vegetation and other items affecting sighting distances
- advanced warning signage, line marking and delineation on road approaches
- installation of Vehicle Activated Signage (VAS) on road approaches
- minor realignment of road approaches to improve sighting distance
- removal of solid materials that restrict sighting distance
- installation of new or upgrade of existing street lighting near a level crossing
- upgrading existing pedestrian level crossing approaches adjacent to a road, or at standalone pedestrian level crossing sites
- installing treatments to slow traffic (traffic calming), but not speed limit reductions (see “Have your say about speed limits”)
- road resurfacing on the immediate approaches to a level crossing, measured from the nearest rail up to 50 m on each side (if the crossing is within 50 m of a road termination, the measurement extends only to the edge of the terminating road).
When the project can start and end
- Design and planning approvals must be complete within three months of the project's successful notification letter.
- Provision of a Post-Completion Report (PCR) must occur within three months of the completion of construction.
All projects must be finalised (including PCR submitted to Transport) by June 2027.
The project should be started by 30 September 2026 and the project must be completed by 1 June 2027.
Outcomes for projects funded under this grant
Minor works projects should be short term in nature, and must be completed in the following timeframes:
- Design and planning approvals must be complete within three months of the project's successful notification letter.
- Provision of a Post-Completion Report (PCR) must occur within three months of the completion of construction.
All projects must be finalised (including PCR submitted to Transport) by 30 June 2027.
What costs you can apply for
Costs must be directly related to the development and implementation of the project scope outlined in the application.
Who can’t apply
Level crossings located in councils in Greater Sydney are not eligible.
What costs you can't apply for
- ongoing maintenance costs associated with a project
- costs associated with works not listed as eligible treatments above
- costs associated with works on private land not accessible by the public.
Types of projects not funded under this grant
- Works relating to private level crossings
- Works on roads that interface with an inactive/non-operational rail line.
- Creating of new pedestrian level crossings
- Projects with awarded contracts for construction or already commenced construction.
- Works within the rail corridor that do not have written support from the relevant RIM.
- Works to rail infrastructure associated with the interface that are the responsibility of the RIM such as primary traffic control devices.
Example projects
- The works proposed must be on a local or regional road.
- Proposed works must be on road approaches to operational level crossings. Any works within the rail corridor require written support from the relevant RIM.
- All works submitted for funding must focus on improving level crossing safety.
What co-contributions are required
Collaboration and co-funding from other organisations are strongly encouraged. Councils must list all funding sources contributing to the project.
Councils are required to submit written confirmation of any funding co-contributions for projects at the application stage.
Additional eligibility requirements
For a project with works inside the rail corridor to be eligible for funding consideration, Councils must attach a written letter of support from the RIM at the time of application submission. The treatment undertaken within the rail corridor must also comply with the list of eligible treatments listed in section 3.2
Engineering report(s) and/or risk assessments if available.
Co-contributions details and supporting evidence.
Any other supporting evidence including audits, risk assessments, or reports that have identified non-compliances to Australian Standards or other relevant standards.
Most recent recipients
What was approved
Approved for Clarence Valley Council
Replacement of level crossing pavement markings, installation of missing or damaged signage and vegetation clearing to improve sight distance to approaching trains.
$48,060 was approved by
The Chair of the Level Crossing Strategy Council (LCSC)Date approved
June 2026Location of the project
Grafton 2460Location of the recipient
Grafton 2460About the grant
Applications approved
16
Applications received
31
LCIP - Round Two 2026/27
Program term
30/06/2027What was approved
Approved for Coolamon Shire Council
Upgrade of 15 level crossings, including vegetation clearing, signage renewal, line marking renewal and road surface repairs.
$28,387 was approved by
The Chair of the Level Crossing Strategy Council (LCSC)Date approved
June 2026Location of the project
Coolamon 2701Location of the recipient
Coolamon 2701About the grant
Applications approved
16
Applications received
31
LCIP - Round Two 2026/27
Program term
30/06/2027What was approved
Approved for Griffith City Council
Upgrade and improve Give Way / Stop lines at 23 level crossings and Criss-Cross Yellow hatching at 17 level crossings.
$117,189 was approved by
The Chair of the Level Crossing Strategy Council (LCSC)Date approved
June 2026Location of the project
Griffith 2680Location of the recipient
Griffith 2680About the grant
Applications approved
16
Applications received
31
LCIP - Round Two 2026/27
Program term
30/06/2027What was approved
Approved for Leeton Shire Council
Safety improvement works at 19 level crossings to address defects relating to signage, vegetation, line marking and road surface.
$70,300 was approved by
The Chair of the Level Crossing Strategy Council (LCSC)Date approved
June 2026Location of the project
Leeton 2705Location of the recipient
Leeton 2705About the grant
Applications approved
16
Applications received
31
LCIP - Round Two 2026/27
Program term
30/06/2027What was approved
Approved for Mid-Western Regional Council
Resurface the approaches on both sides of the level crossing at the Bylong Valley Way - Wollar intersection (LX 1295) with 8.5 m‑wide 41m long asphalt to enhance road user safety, including improved signage and line marking.
$94,168 was approved by
The Chair of the Level Crossing Strategy Council (LCSC)Date approved
June 2026Location of the project
Bylong 2849Location of the recipient
Mudgee 2850About the grant
Applications approved
16
Applications received
31
LCIP - Round Two 2026/27
Program term
30/06/2027What your application needs to include
Prepare your application with this checklist
- Basic information about the project – including, but not limited to:
- level crossing ID
- project location (including GPS co-ordinates)
- photos
- consultation with relevant authorities (RIMs etc)
- description of the proposed scope of works
- Road traffic counts for the project location if available.
- Project timeline for delivery, including expected start and finish dates.
- Cost estimates, funding sought from Transport and details of any co-contributions.
- Evidence of an interface agreement, or a commitment to seeking to enter into an interface agreement in a timely manner.
- Any relevant community, emergency services, or other agency consultation and feedback to support the project.
- A summary of expected safety outcomes.
- A summary of expected benefits to the community.
Address the eligibility criteria
Each applicant, as part of an application response, must confirm that they meet the eligibility criteria.
Applicants that do not address the eligibility criteria in full may be excluded from the application process at the department's discretion.
Address the assessment criteria
Australian Level Crossing Assessment Model (ALCAM) rating for the Level Crossing 20% Transport
Safety incident data (crashes and near hits at the level crossing) 15% Transport
Safety and community benefits of the nominated project 15% Derived from Council’s application
Value for money and project deliverability 25% Derived from Council’s application
Evidence of identified defects e.g. audits, engineering report(s), risk assessments, photos, letters of support 25% Derived from Council’s application and supporting documentation
Start the application
Applications may be assessed progressively during the application period against the published assessment criteria. Early submission does not provide any advantage, and funding is not guaranteed.
Each application will be subject to a competitive, merit-based assessment process to support the selection of projects that meet the Program objective of improving road safety around public level crossings.
Note: If you are a new applicant to SmartyGrants, you will need to register and create a password. If you are already registered, you can log in with your existing username and password.
Apply now
After the application is submitted
Successful applications will be decided by: The Chair of the Level Crossing Strategy Council (LCSC)
Applications will be assessed by a panel formed within Transport. The panel will review all applications based on the principles and priorities outlined in these guidelines, including.
- Eligibility requirements (Section 3)
- Alignment with program objectives and assessment criteria (Section 2), and
- Delivery timeframes (Section 4)
Anticipated assessment outcome date is 30/06/2026
Anticipated date for funding deed execution with successful applicants is 31/07/2026
Support and contact
CouncilLXMinorWorks@transport.nsw.gov.au