Skip to main content

Pipeline to be built in Broken Hill

24 October 2017
A 270-kilometre water pipeline from the River Murray to Broken Hill will be completed by the end of 2018.
Broken Hill NSW2

The Broken Hill pipeline project will inject approximately $50 million into the Wentworth and Broken Hill economies and generate more than 150 local jobs. It will also support steel jobs in the Illawarra.

John Holland MPC Group Joint Venture will design and construct the $467 million pipeline, which will be built substantially from steel rolled in Australia.

Minister for Regional Water Niall Blair said the people of Broken Hill had the same right as anyone else in NSW to have a safe and reliable supply of water.

“The government has carefully considered every possible option for securing a long-term water supply for Broken Hill,” Mr Blair said.

The project will be managed by WaterNSW. Detailed planning and design works will start immediately, with construction starting in 2018.

Find out more about water security for Broken Hill

Environment Infrastructure
Top of page