Key resources
Document title | Description |
---|---|
PLR Stage 2 Enabling Works Update - December 2024 to January 2025 | Preliminary work and site investigations will commence in December 2024 and continue into January 2025. This work will help determine site conditions and prepare for construction. |
Safety improvement work near Cumberland Hospital from Monday 28 October 2024 | Transport for NSW will carry out road and pedestrian safety improvement work near Cumberland Hospital on behalf of Parramatta Light Rail between Monday 28 October and Friday 8 November 2024. |
Kerbside changes to support (PDF 383.1KB) Parramatta Light Rail operations (PDF 383.1KB) | Roads along the Parramatta Light Rail alignment with current 'No stopping' and 'No parking' zones, will see special tow away areas come into effect from Wednesday 23 October 2024, to support operations. |
Out of hours works- Church Street planter boxes (PDF 290.62KB) | Works will be carried out to install planter boxes along Church Street, Parramatta. |
Stabling and Maintenance Facility Update October to December 2024 (PDF 416.39KB) | Upcoming work activities for October and December. |
Improvements to Robin Thomas Reserve, Parramatta (PDF 625.38KB) | Work is continuing to complete the upgrade to Robin Thomas Reserve. |
Out of hours work – removal of barriers at Childrens Hospital stop (PDF 434.54KB) | The removal of temporary fencing and barriers is required at the Childrens Hospital light rail stop. |
Stabling and Maintenance Facility Update July to August 2024 (PDF 738KB) | Upcoming work activities for July and August. |
Out of Hours Work – Carlingford Light Rail Stop to Camellia (PDF 468.04KB) | Tree trimming works will be carried out between Carlingford and the Sandown Line, Camellia to ensure branches are a safe distance from the light rail vehicles. |
Out of hours work - Barrack Lane - substation drainage work (PDF 481.01KB) | Work to complete pit drainage for the traction power substation in Barrack Lane, Parramatta. |
Out of hours work - pit excavation at Bridge Road, Cumberland Precinct (PDF 344.93KB) | Pit excavation work is required for the earthing of a radio mast. |
Leamington Rd Underpass and Active Transport Link ramp closure, Dundas (PDF 340.45KB) | Removal of anti-graffiti film before painting of a mural can begin at the Leamington Road underpass and ramp. |
Investigation Works - Waratah, Mary and Andrew streets, Ermington (SW24) (PDF 380.49KB) | Investigation works of existing inground utilities for the Parramatta Light Rail Stage 2 enabling works package. |
Noisy Work - Pit excavation work at Bridge Road Cumberland (SOM 170) (PDF 336.8KB) | Pit excavation work is required for the earthing of a radio mast. |
Update: Out of hours work, Barrack Lane substation drainage works (SOM 165C) | Work to complete pit drainage for the traction power substation in Barrack Lane, Parramatta. |
Construction update – Carlingford to Westmead June to July (SOM 168) (PDF 447.28KB) | Testing and commissioning activities to support the functionality and performance of the light rail network between Carlingford and Westmead. |
Noisy Out of Hours Work - Stabling and Maintenance Facility Camellia (SOM 166) (PDF 423.22KB) | Hydro-demolition of the concrete rail with disposal of wastewater generated within the Stabling and Maintenance Facility, Camellia. |
Out of hours work - treet trimming (SOM 167) (PDF 603.96KB) | Tree trimming work is required on the light rail alignment to prevent branches falling on the tracks. |
Out of hours work - Rydalmere (PDF 297.79KB) | Rail grinding works between Yallamundi Stop to Rosehill Gardens Stop, Rydalmere. |
Drainage works, Church Street Parramatta (IW542) (PDF 652.43KB) | Work to install drainage will be carried out at Church Street, between Macquarie Street and George Street, Parramatta. |
Update: Out of hours work, Barrack Lane substation drainage works (PDF 406.47KB) | Work to complete pit drainage for the traction power substation in Barrack Lane, Parramatta. |
Installation of advance warning signs, North Parramatta and Westmead (PDF 304.53KB) | Installation of light rail advance warning signs on Fleet Street, North Parramatta and Hainsworth Street, Westmead. |
Stabling and Maintenance Facility Update May to June 2024 (PDF 426KB) | Upcoming work activities for May and June. |
Out of hours work: Barrack Lane substation drainage works (PDF 378.57KB) | Work to complete pit drainage for the traction power substation in Barrack Lane, Parramatta. |
Installation of kerb ramps, Telopea and Rydalmere (PDF 284.93KB) | Installation of kerb ramps, Telopea Street Telopea and reserve Street Rydalmere. |
Out-of-hours work Barrack Lane, Parramatta (SOM 163) (PDF 281.22KB) | Work to complete pit drainage for the traction power substation in Barrack Lane, Parramatta. |
Out-of-hours work Hawkesbury Road, Westmead (IW541) (PDF 659.68KB) | Work to seal rail joints will be carried out at Hawkesbury Road, Westmead. Work will take place between 8-10 April. |
Construction update, April and May 2024 – Carlingford to Westmead (PDF 327.48KB)(SOM162) | Testing and commissioning activities to support the functionality and performance of the light rail network between Carlingford. |
Stabling and Maintenance Facility Construction Update April 2024 (PDF 419.83KB) (SOM161) (PDF 419.83KB) | April work activities scheduled for the Stabling and Maintenance Facility (fleet depot) |
Speed limit on Church Street between Victoria Road and Barney Street, Parramatta will be reduced to 50km/h. | |
Out-of-hours work – Intersection of O'Connell Street and Factory Street, North Parramatta (PDF 589.61KB) | Out-of-hours work to seal rail joints will be undertaken at the intersection of O’Connell Street and Factory Street, North Parramatta. |
Out-of-hours work Intersection of Church Street and Victoria Road, Parramatta (PDF 543.44KB) | Out-of-hours work for the Parramatta Light Rail Stage 1 project at the intersection of Church Street and Victoria Road. |
Permanent traffic conditions – North Parramatta | Notification about current traffic conditions in North Parramatta remaining in place to support public safety and the effective operation of Parramatta Light Rail. |
Permanent traffic conditions – Parramatta CBD | Notification about current traffic conditions in Parramatta CBD remaining in place to support public safety and the effective operation of Parramatta Light Rail. |
Out-of-hours work – Camellia to Westmead, including North Parramatta and the Parramatta CBD (SOM 161) | Out-of-hours work for the Parramatta Light Rail Stage 1 project – Camellia to Westmead, including North Parramatta and the Parramatta CBD. |
Out-of-hours work, Adderton Road Telopea (IW537) | Out-of-hours work for the Parramatta Light Rail Stage 1 project – Camellia to Westmead, including North Parramatta and the Parramatta CBD. The work will take place between Monday 11 March and Friday 15 March 2024. |
Stabling and Maintenance Facility construction update – March 2024 (SOM159) | Construction update for the delivery of the Stabling and Maintenance Facility (fleet depot), which is being built at 6 Grand Avenue, Camellia. |
Update: Out-of-hours work – overhead wiring, North Parramatta (SOM 152b) | Out-of-hours work update regarding the installation of overhead wiring on Factory and Church Streets, North Parramatta. The night work has been rescheduled and will now take place between Tuesday 27 February and Wednesday 28 February 2024. The work will be carried out between 7pm and 7am. |
Update: Out-of-hours work – overhead wiring, North Parramatta (SOM152a) | Out-of-hours work update regarding the installation of overhead wiring on Factory and Church Streets in North Parramatta. |
Out-of-hours work Camellia to Carlingford – February 2024 (SOM 158) | Out-of-hours work for the Parramatta Light Rail Stage 1 project – Camellia to Carlingford. |
Westmead to North Parramatta – February to March 2024 (SOM 157) | Out-of-hours work for the Parramatta Light Rail Stage 1 project – Westmead to North Parramatta. |
Stabling and Maintenance Facility in Camellia – February 2024 (SOM 156) | Construction update for delivery of the Stabling and Maintenance Facility (fleet depot) at 6 Grand Avenue, Camellia. The facility will be used to house and maintain all Parramatta Light Rail vehicles and support the future operation of the light rail. |
CBD to Tramway Avenue, Parramatta – February to March 2024 (SOM 155) | Construction update for the Parramatta Light Rail Stage 1 project – CBD to Tramway Avenue. |
Camellia to Carlingford – February to March 2024 (SOM 153) | Construction update for the Parramatta Light Rail Stage 1 project – Camellia to Carlingford. |
Testing identifies small quantity of asbestos in landscaping site at Telopea | Transport for NSW is supporting the Environmental Protection Authority's wide-ranging investigations by proactively testing construction sites across Sydney. A single positive trace of bonded asbestos was found in recycled mulch in a garden bed at Telopea near the Parramatta Light Rail stop. |
Document title | Description |
---|---|
Acoustic Advisor Monthly Report - November 2024 | This report details the November 2024 activities of the Acoustic Advisor for Parramatta Light Rail Stage 1 |
Environmental Representative Report - November 2024 | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. |
Acoustic Advisor Monthly Report - November 2024 | This report details the November 2024 activities of the Acoustic Advisor for Parramatta Light Rail Stage 2 |
Environmental Representative Report - November 2024 | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 2 progress. |
Environmental Representative Report - October 2024 | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. |
Acoustic Advisor Monthly Report - October 2024 | This report details the November 2024 activities of the Acoustic Advisor for Parramatta Light Rail Stage 1 |
Environmental Representative Report - September 2024 | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 2 progress. |
Environmental Representative Report - September 2024 (PDF 2.9MB) | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. |
Acoustic Advisor Monthly Report - September 2024 (PDF 526.43KB) | This report details the September 2024 activities of the Acoustic Advisor for the Parramatta Light Rail project. |
Environmental Representative Report - August 2024 (PDF 571.33KB) | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. |
Acoustic Advisor Monthly Report - August 2024 (PDF 951.28KB) | This report details the August 2024 activities of the Acoustic Advisor for the Parramatta Light Rail project. |
Environmental Representative Report - July 2024 (PDF 1.8MB) | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. |
Acoustic Advisor Monthly Report - July 2024 (PDF 628.36KB) | This report details the July 2024 activities of the Acoustic Advisor for the Parramatta Light Rail project. |
Environmental Representative Report - June 2024 (PDF 997.33KB) | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. |
Acoustic Advisor Monthly Report - June 2024 (PDF 534.65KB) | This report details the June 2024 activities of the Acoustic Advisor for the Parramatta Light Rail project. |
Special Events Management Sub-Plan (PDF 9.91MB) | This sub-plan was developed to address light rail operations during special events, such as those held at Western Sydney Stadium, Parramatta Park or Rosehill Gardens Racecourse. |
Operational Noise and Vibration Management Sub-Plan (PDF 12.24MB) | The scope of this Sub-plan is to outline the mitigation and management measures that Greater River City Light Rail will use to address potential impacts from noise and vibration during Project operations, while complying with relevant approval, statutory and contract requirements. |
Operational Waste Management Sub-Plan (PDF 3.71MB) | The scope of this Sub-plan is to outline the mitigation and management measures that Greater River City Light Rail will use to address potential impacts from waste resource and energy consumption during Project operations, while complying with relevant approval, statutory and contract requirements. |
Operational Flora Fauna Management Sub-Plan (PDF 12.6MB) | The scope of this Sub-plan is to outline the mitigation and management measures that Greater River City Light Rail will use to address potential operational impacts to flora and fauna during operations, while complying with relevant approval, statutory and contract requirements. |
Operational Environmental Management Plan (PDF 10.52MB) | This Plan provides the Environmental Management System to be implemented during the operation of the Project to satisfy the requirements of the relevant planning approvals and to meet the commitments outlined in the Greater River City Light Rail Environment and Sustainability Policy. |
PLR Construction Compliance Report 10 (August 2023-January 2024 (PDF 9.48MB)) (PDF 9.48MB) | This report documents Transport for NSW and its Contractors' compliance with the project's planning approval. |
Acoustic Advisor Monthly Report - April 2024 (PDF 249.78KB) | This report details the April 2024 activities of the Acoustic Advisor for the Parramatta Light Rail project. |
Acoustic Advisor Monthly Report - March 2024 (PDF 357.89KB) | This report details the March 2024 activities of the Acoustic Advisor for the Parramatta Light Rail project. |
Environmental Representative Report - April 2024 (PDF 1.32MB) | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. |
Environmental Representative Report - March 2024 (PDF 1.54MB) | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. |
Operational Noise and Vibration Review (PDF 19.93MB) | This report addresses operational noise and vibration associated with light rail operations between Westmead and Carlingford. |
Acoustic Advisor Monthly Report – February 2024 (PDF 409.54KB) | This report details the February 2024 activities of the Acoustic Advisor for the Parramatta Light Rail project. |
Environmental Representative Monthly Report – February 2024 (PDF 1.82MB) | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. |
Acoustic Adviser Monthly Report – January 2024 | This report details the January 2024 activities of the Acoustic Advisor for the Parramatta Light Rail project. This includes site inspections, monitoring, alerts, any non-compliance and incidents, ongoing and upcoming environmental risks, recommendations, and more. |
Acoustic Adviser Monthly Report – December 2023 | This report details the December 2023 activities of the Acoustic Advisor for the Parramatta Light Rail project. This includes site inspections, monitoring, alerts, any non-compliance and incidents, ongoing and upcoming environmental risks, recommendations, and more. |
Acoustic Adviser Monthly Report – November 2023 | This report details the November 2023 activities of the Acoustic Advisor for the Parramatta Light Rail project. This includes site inspections, monitoring, alerts, any non-compliance and incidents, ongoing and upcoming environmental risks, recommendations, and more. |
Environmental Representative Monthly Report – January 2024 | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. It includes information related to the Infrastructure and the Supply, Operate, Maintain packages. |
Environmental Representative Monthly Report – December 2023 | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. It includes information related to the Infrastructure and the Supply, Operate, Maintain packages. |
Environmental Representative Monthly Report – November 2023 | The Parramatta Light Rail Environmental Representative prepares and delivers this monthly report on Stage 1 progress. It includes information related to the Infrastructure and the Supply, Operate, Maintain packages. |
Parramatta Light Rail Stage 1: Staging Report | This report outlines the proposed staging of works for the Parramatta Light Rail Stage 1 project. It describes how and when the conditions of approval will be addressed by each stage (or package) throughout the Stage 1 construction process. |
Parramatta Light Rail Stage 1: EIS documents | Environmental Impact Statement (EIS) documents relating to the Parramatta Light Rail Stage 1 project. |
Parramatta Light Rail Stage 1: Supply Operate and Maintain (Package 5) Works, Construction Air Quality Management Plan | This plan establishes a set of best practice procedures for the management and protection of air quality during construction of the Parramatta Light Rail project. It ensures appropriate controls and procedures are implemented to avoid or minimise air quality impacts and potential adverse impacts to sensitive receivers surrounding the project. |
Parramatta Light Rail Stage 1: Supply Operate and Maintain (Package 5) Works, Construction Environmental Management Plan | This plan details the strategies of the Great River City Light Rail in mitigating environmental risks and achieving environmental objectives for the Parramatta Light Rail project. This plan is the overarching document of the environmental management system for the project and applies to staff and subcontractors associated with the construction of the project. |
Parramatta Light Rail Stage 1: Supply Operate and Maintain (Package 5) Works, Construction Heritage Manage Plan | This plan outlines how Great River City Light Rail proposes to manage and control construction impacts to heritage during construction of the Parramatta Light Rail. |
Parramatta Light Rail Stage 1: Supply Operate and Maintain (Package 5) Works, Construction Noise and Vibration Management Plan | This plan outlines how Great River City Light Rail proposes to manage potential noise and vibration impacts during construction of Parramatta Light Rail. |
Parramatta Light Rail Stage 1: Supply Operate and Maintain (Package 5) Works, Construction Soil and Water Management Plan | This plan details how the Great River City Light Rail proposes to protect water quality and minimise soil impacts during construction of the Parramatta Light Rail. |
Parramatta Light Rail Stage 1: Supply Operate and Maintain (Package 5) Works, Construction Traffic, Transport and Access Management Plan | This plan details how Great River City Light Rail proposes to manage traffic during construction of the Parramatta Light Rail project, including traffic control and any potential hazards associated with the traffic environment. |
Parramatta Light Rail Stage 1: Supply Operate and Maintain (Package 5) Works, Construction Waste and Resource Management Plan | This plan details how Great River City Light Rail proposes to manage waste and resources during the construction of the Parramatta Light Rail. |
Parramatta Light Rail Stage 1: Supply Operate and Maintain (Package 5) Works, Contaminated Land Management Plan | This plan details how Great River City Light Rail proposes to manage and control construction impacts of the Parramatta Light Rail with respect to contamination. |
Parramatta Light Rail Stage 1: Supply Operate and Maintain (Package 5) Works, Flora and Fauna Management Plan | This plan details how Great River City Light Rail proposes to manage and control construction impacts to flora and fauna during the Parramatta Light Rail project. |
Parramatta Light Rail Stage 1: Operational Noise and Vibration Review | This report addresses operational noise and vibration associated with the Paramatta Light Rail operations between Westmead and Carlingford, and environmental noise from the proposed Stabling and Maintenance Facility, electrical substations and the light rail stops. |
Parramatta Light Rail Stage 1: Project Extensions Approved by the Secretary February 2024 | This document contains letters about the Parramatta Light Rail Project Extensions Approved by the Secretary of the Department of Planning and Environment (Planning Secretary), including the requested extension, request date, approval date, and the relevant condition. |
Parramatta Light Rail Stage 2: Environmental Impact Statement | This Parramatta Light Rail Stage 2 EIS comprises 25 chapters, along with appendices and technical papers. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 1 – Design, Place and Movement | This technical paper is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It describes the design, place and movement requirements for the project and how these would be met. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 2 – Transport and Traffic | This technical paper is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It assesses the potential transport and traffic impacts from constructing and operating the project. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 3 – Noise and Vibration | This technical paper is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It assesses the potential noise and vibration impacts from constructing and operating the project. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 4 – Preliminary Aboriginal Cultural Heritage Assessment Report | This technical paper is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It assesses the potential Aboriginal heritage impacts associated with construction and operation of the project. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 5 – Statement of Heritage Impact – Built Heritage | This technical paper is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It assesses the potential built heritage impacts from constructing and operating the project. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 6 – Historical Archaeological Assessment | This technical paper is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It identifies and assesses the impacts of the constructing and operating the project on the non-Aboriginal archaeological resource (including maritime archaeology) within the project site. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 7 – Social Impact Assessment | This technical paper is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It aims to identify and evaluate the social impacts and necessary mitigation measures for the social locality during the project's construction and operation. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 8 – Business Impact Assessment | This technical paper is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It identifies and assesses the local business impacts of the project during both construction and operation. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 9 – Biodiversity Development Assessment Report | This report is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It assesses the potential ecological impacts of constructing and operating the project in accordance with the NSW Biodiversity Offsets Scheme and the Planning Secretary's environmental assessment requirements for biodiversity. |
Parramatta Light Rail Stage 2 EIS: Technical Paper 10 – Hydrology, Flooding and Water Quality Assessment | This technical paper is one of several technical papers that form part of the EIS for the Parramatta Light Rail Stage 2 project. It identifies and assesses the potential impacts of the project in relation to hydrology, flooding and water quality during construction and operation. |
Parramatta Light Rail Stage 2: Updated Noise and Vibration Report | This report has been updated to include an additional assessment of the potential noise and vibration impacts of constructing and operating the Parramatta Light Rail Stage 2 project since the exhibition of the EIS in late 2022. |
Parramatta Light Rail Stage 2: Aboriginal Cultural Heritage Assessment Report | This report has been updated to include an additional assessment of the Aboriginal cultural heritage of constructing and operating the Stage 2 project since the exhibition of the EIS in late 2022. |
Parramatta Light Rail Stage 2: Updated Statement of Heritage Impact | This report has been updated to include an additional assessment of the potential built heritage impacts of constructing and operating the Parramatta Light Rail Stage 2 project since the exhibition of the EIS in late 2022. |
Parramatta Light Rail Stage 2: Updated Historical Archaeological Assessment | This report has been updated to include an additional assessment of the potential historical archaeological impacts of constructing and operating the Parramatta Light Rail Stage 2 project since the exhibition of the EIS in late 2022. |
Parramatta Light Rail Stage 2: Supplementary Design, Place and Movement Report | This report has been updated to include an additional design development of the Parramatta Light Rail Stage 2 project since the exhibition of the EIS in late 2022. This supplementary report aims to further minimise impacts on the environment and community, and should be read in conjunction with Technical Paper 1 – Design, Place and Movement. |
Parramatta Light Rail Stage 2: Updated Biodiversity Development Assessment Report | This report has been updated to include an additional assessment of the potential biodiversity impacts of constructing and operating the Parramatta Light Rail Stage 2 project since the exhibition of the EIS in late 2022. |
Parramatta Light Rail Stage 2: Supplementary Flooding Report | This report has been updated to include additional flooding assessments of the potential hydrologic impacts of the Parramatta Light Rail Stage 2 project since the exhibition of the EIS in late 2022. This supplementary report should be read in conjunction with Technical Paper 10 – Hydrology, Flooding and Water Quality Assessment. |
Parramatta Light Rail Stage 2: Interpretive Contamination Report | This report consolidates and interprets available contamination data to describe contamination conditions within and alongside the Parramatta Light Rail Stage 2 boundary. It also identifies potential impacts to project delivery. |
Parramatta Light Rail Stage 2: EIS Response to Submissions – Main Report | The exhibition of EIS for the Parramatta Light Rail Stage 2 (SSI-10035) ended on 16 December 2022. This report addresses all issues raised in submissions from members of the public, interest groups and local government councils, and issues raised in advice from state government agencies. |
Parramatta Light Rail Stage 2: EIS Response to Submissions – Appendices | This submissions register outlines the submissions received during the public exhibition of the Parramatta Light Rail Stage 2 EIS. It ensures transparency and accountability by documenting and addressing public input throughout the EIS process. |
Parramatta Light Rail Stage 2: EIS Amendment Report – Main Report | Transport for NSW is proposing a number of design amendments and refinements to the Parramatta Light Rail Stage 2 following the exhibition of the EIS in late 2022. This Amendment Report describes and assesses the potential impacts of the amendments and identifies how those impacts would be managed and mitigated, particularly in respect to land use and property, traffic and access, and biodiversity. |
Document title | Description |
---|---|
Parramatta Light Rail Stage 1 overview (PDF 920.38KB) | Learn about the Parramatta Light Rail Stage 1 project, its key features and benefits, and what is happening during construction. |
Parramatta Light Rail Stage 2 overview (PDF 1.14MB) | Learn about the Parramatta Light Rail Stage 2 project, its key features and benefits, and the current consultation process. |
Parramatta Light Rail frequently asked questions (PDF 377.6KB) | Frequently asked questions for the Parramatta Light Rail project. |
Light rail stops | Factsheet about the Parramatta Light Rail stops, including information about the builders, number of stops being constructed and key features. |
Light rail vehicles | Factsheet about the Parramatta Light Rail vehicles, including information about the innovative vehicle design, key features and benefits, technical specifications, and accessibility options. |
Parramatta Light Rail Stage 1: Testing and commissioning | Factsheet about the testing and commissioning process for the Parramatta Light Rail Stage 1 project. |
Parramatta Light Rail Stage 2: Camellia Precinct | Factsheet about the Camellia Precinct as part of the Parramatta Light Rail Stage 2 project. |
Parramatta Light Rail Stage 2: Ermington Boat Ramp | Factsheet about the Parramatta Light Rail Stage 2 enabling works and the closure of the Ermington Boat Ramp for up to 3 years. |
Parramatta Light Rail Stage 2: Ermington Precinct | Factsheet about the Ermington Precinct as part of the Parramatta Light Rail Stage 2 project. |
Parramatta Light Rail Stage 2: Melrose Park Precinct | Factsheet about the Melrose Park Precinct as part of the Parramatta Light Rail Stage 2 project. |
Parramatta Light Rail Stage 2: Rydalmere Precinct | Factsheet about the Rydalmere Precinct as part of the Parramatta Light Rail Stage 2 project. |
Parramatta Light Rail Stage 2: Sydney Olympic Park and Carter Street Precincts | Factsheet about the Sydney Olympic Park and Carter Street Precincts as part of the Parramatta Light Rail Stage 2 project. |
Parramatta Light Rail Stage 2: Wentworth Point Precinct | Factsheet about the Wentworth Point Precinct as part of the Parramatta Light Rail Stage 2 project. |
Document title | Description |
---|---|
Project Extensions Approved by the Secretary (PDF 2.97MB) | This document lists the Parramatta Light Rail project extensions approved by the Secretary. |
E105 register (Rev.64.01) | This is the register for E105. |
Green track for Parramatta Light Rail research report | This report assesses the viability of establishing green track as part of the Parramatta Light Rail project. It aids decision-making processes for a green track in Parramatta, demonstrating responsible urban design for better mobility and environmental sustainability. |
Parramatta Light Rail – Members of the Business Reference Group | The document lists the names, roles and organisations of the Parramatta Light Rail Business Reference Group members. |
Parramatta Light Rail Stage 1: Construction Compliance Report #9 (February to July 2023) | This report documents Transport for NSW and its contractors' compliance with the project's planning approval (Infrastructure Approval SSI-8285), granted by the Secretary of the NSW Department of Planning and Environment in May 2018. This report covers the period from 1 February 2023 to 31 July 2023. |
Parramatta Light Rail Stage 1: Community Communication Strategy | This strategy supports communication and engagement activities for the Parramatta Light Rail project, from development to post-completion. It is a dynamic working document that will be updated throughout the project to reflect the changing social environment and issues as they emerge. |
Parramatta Light Rail Stage 2: Community Communication Strategy | This strategy guides the management and delivery of communication and engagement during the development, pre-construction and construction of the Parramatta Light Rail Stage 2 project, and for 12 months following the completion of construction. |
Parramatta Light Rail Stage 1: Walking and bike riding map (PDF 4.37MB) | This map provides important information on safe, active travel on the shared walking and bike-riding path (also known as the Active Transport Link) built as part of the Parramatta Light Rail Stage 1 project. |
Translating and interpreting service
For interpreter services for languages other than English, call Translating and Interpreting Service (TIS National) on 131 450 and ask them to call us on 1800 139 389.
Contact Parramatta Light Rail
For more information, enquiries or to lodge a complaint, please contact us:
- Phone: 1800 139 389 (24-hour community information line)
- Email: parramattalightrail@transport.nsw.gov.au
- Address: Level 7, 4 Parramatta Square, 12 Darcy Street, Parramatta NSW 2150
Follow us on Facebook:
Follow Transport for NSW
Follow us on social media.