Stages 1 and 2

A static map displaying stages 1 and 2 of the Parramatta Light Rail.
Download Parramatta Light Rail Stages 1 and 2 map (JPG 1.3MB)A static map displaying stages 1 and 2 of the Parramatta Light Rail. Stage 1 will have 16 stops across Carlingford, Camellia, Parramatta CBD, Parramatta North and Westmead. Stage 2 will have 14 stops across Rydalmere, Ermington, Melrose Park, Wentworth Point, Sydney Olympic Park, and Carter Street.
From the left-hand of the map, Stage 1 extends from the west to the north-east starting at Westmead heading north-east up Hawkesbury Road, and then proceeds further east to Factory Street. From there Stage 1 goes south down Church Street, and then heads east again down Macquarie Street, then George Street, then Tramway Avenue then continues north-east all the way up to Carlingford where it concludes.
Stage 2 starts at the right-hand side of the map at Carter Street, and heads east down Dawn Fraser Avenue, then goes north up Australia Avenue. From there it heads east again down Hill Road, then north again to cross the Parramatta River and down Waratah Street. Then it continues west down Boronia Street, then South Street, and then south-west where there are 2 different routes, one being the preferred route that goes down from South Street, crosses the Parramatta River, then west down Grand Avenue.
The second is an alternative route under consideration for Stage 2 that instead goes west shortly after South Street, and crosses the Parramatta River then meets Grand Avenue. Further down Grand Avenue there is a stabling and maintenance facility on the south side of the route, which then continues to Camellia where it meets Stage 1.
From here it continues north-west down Tramway Avenue to the first interchange stop, then down George Street to another interchange stop, then down Macquarie Street to the last interchange stop, which is the final part of the preferred route for Stage 2. A small section that continues north-west off this is a turnback option that is under consideration.
Stage 1

A static map that displays Stage 1 of the Parramatta Light Rail route. The route starts on the left-hand side of the map at the Westmead light rail stop, just above Westmead railway station. It heads north-east up Hawkesbury Road where it stops at Westmead Hospital and then Children's Hospital. From there it proceeds further east to the Ngara stop on Factory Street, then goes south down Church Street to the Benaud Oval, Fennell Street, Prince Alfred Square and Church Street stops. The route then heads east down Macquarie Street to the Parramatta Square and Robin Thomas stops. Then it continues down George Street, then to the Tramway Avenue stop, and then turns north-east stopping at Rosehill Gardens, Yallamundi, Dundas, and Telopea, with the last stop at Carlingford.
Stage 2

A static map that displays stage 2 of the Parramatta Light Rail. The route starts on the left-hand side of the map at the Parramatta Square light rail stop, located below the ferry stop, and above the train station, bus stop and a metro station that’s under construction.
It heads east where it stops at Robin Thomas and Tramway Avenue, then continues east through Camellia where it stops at Sandown Boulevard and where the Stabling and Maintenance Facility is located. It then continues north-east to Rydalmere where it stops at John Street near a Ferry stop, then continues south-east and stops at Nowill Street and River Road.
From there it goes north-east into Melrose Park stopping at Murdoch Street, Atkins Road and the Melrose Park stops. It then heads down south-east, stopping at Waratah Street, then crossing over Parramatta River Into Wentworth Point stopping at Footbridge Boulevard below a ferry stop.
The route continues south-west stopping at Hill Road and Holker Street, before heading south-east into Sydney Olympic Park where it stops at Jacaranda Square and Olympic Boulevard, just above train and bus stops as well as a metro stop that is under construction. This route then concludes at the last stop at Carter Street.
A static map that displays stage 2 of the Parramatta Light Rail. The route starts on the left-hand side of the map at the Parramatta Square light rail stop, located below the ferry stop, and above the train station, bus stop and a metro station that’s under construction.
It heads east where it stops at Robin Thomas and Tramway Avenue, then continues east through Camellia where it stops at Sandown Boulevard and where the Stabling and Maintenance Facility is located. It then continues north-east to Rydalmere where it stops at John Street near a Ferry stop, then continues south-east and stops at Nowill Street and River Road.
From there it goes north-east into Melrose Park stopping at Murdoch Street, Atkins Road and the Melrose Park stops. It then heads down south-east, stopping at Waratah Street, then crossing over Parramatta River Into Wentworth Point stopping at Footbridge Boulevard below a ferry stop.
The route continues south-west stopping at Hill Road and Holker Street, before heading south-east into Sydney Olympic Park where it stops at Jacaranda Square and Olympic Boulevard, just above train and bus stops as well as a metro stop that is under construction. This route then concludes at the last stop at Carter Street.
Active Transport Link

A static map that displays the Parramatta Light Rail route as well as the active transport link and Parramatta Valley cycleway. The light rail route starts on the left-hand side of the map at the Westmead light rail stop, just above the Westmead railway station. It heads north-east where it stops at Westmead Hospital and then Children's Hospital.
From there it proceeds further east to the Ngara stop, then goes south to the Benaud Oval, Fennell Street, Prince Alfred Square and Church Street stops. The route then heads east to the Parramatta Square and Robin Thomas stops. It then continues east to the Tramway Avenue stop, then turns north-east stopping at Rosehill Gardens, Yallamundi, Dundas, and Telopea, with the last stop at Carlingford.
The active transport link is in 2 parts. The first part is on the left-hand side of the map, and starts at the Children's Hospital light rail stop, and concludes shortly after crossing the new bridge at Cumberland Hospital Precinct. The second active transport link starts on the right-hand side of the map at the Tramway Avenue light rail stop, and follows the light rail route as it turns north-east going past the Yallamundi, Dundas, Telopea stops and then concludes at Carlingford.
The Parramatta Valley Cycleway starts on the left-hand side of the map along the north side of Parramatta River, south of the Children's Hospital light rail stop. The cycleway follows the river through the Parramatta CBD where the cycleway is available on both sides of the river. Just before the Ferry stop the north and south sides of the cycleway meet, then continue to follow the river on the north side until meeting the active transport link, the Parramatta Light Rail route and an existing bridge. From here it diverges from the river into Rydalmere, but then returns to following the river again.
Related links
Contact Parramatta Light Rail
For more information, enquiries or to lodge a complaint, please contact us:
- Phone: 1800 139 389 (24-hour community information line)
- Email: parramattalightrail@transport.nsw.gov.au
- Address: Level 7, 4 Parramatta Square, 12 Darcy Street, Parramatta NSW 2150
Follow us on Facebook:
Follow Transport for NSW
Follow us on social media.

