Recent driving, boating and transport publications
Notice
The northbound lanes will be moved east onto their permanent alignment and will temporarily divert onto the northbound off-ramp into Coffs Harbour while construction of the bypass continues.
Report
This Interpretative Report has been prepared following the completion of the first year of the construction phase groundwater monitoring program undertaken from May 2025 to May 2026 for the Coffs Harbour Bypass (CHB) project.
Report
This Interpretative Report has been prepared following the completion of the first year of the construction phase surface water monitoring program undertaken from April 2025 to April 2026 for the Coffs Harbour Bypass (CHB) project.
Report
The CHB nest box program adopted a staged replacement approach under which the number of artificial hollows was initially derived using a 1:1 replacement ratio, supported by a 20% correction factor to account for the limitations of ground-based hollow counts (TfNSW, 2021).
Report
Sandpiper Ecological Surveys (Sandpiper Ecological) was engaged by TfNSW in November 2020 to provide pre-construction ecological services. These services include preparation of a NBMP, installation of artificial hollows prior to commencement of mainline clearing, and monitoring of nest box use during the construction and operational phases.
Recent Department of Customer Service publications
Reference sheet
The Lived Experience Reference Group (LERG) will provide a key pathway for the Reviewer to engage with and consider the lived experience of the PIRS in line with the scope of the Review.
Reference sheet
The ERG is to provide independent advice to the Reviewer on priority areas to improve the consistency and objectivity of the PIRS and alternative options to determine the degree of permanent impairment in the Scheme or other relevant personal injury-based schemes.
Reference sheet
The Terms of Reference for the statutory review entitled Psychiatric Impairment Rating Scale (PIRS) Review.
Reference sheet
The Stakeholder Reference Group (SRG) is to support the Review by drawing on the experience of representatives from key stakeholder groups impacted by the operation of the PIRS and the supporting processes used to determine the degree of permanent impairment for psychological injury.
Reference sheet
The purpose of the Strategic Governance Committee (SGC) is to provide oversight to the review, to ensure that the review is conducted in accordance with legislative requirements, agreed scope, timeframes and principles of good governance.
Recent community services publications
Fact sheet
Create NSW supports an arts, culture and creative sector where d/Deaf and disabled people can create, lead, work and take part on an equal basis.
Template, Form
Use these forms and resources to apply for the Aged Care Supported Accommodation Program Statewide Provider grant 2026-2031.
Report
The NSW Government has conducted a mid-term review of the NSW Volunteering Strategy 2020 – 2030.
Order
The object of this Order is to amend the Reconstruction Area (Northern Rivers) Order 2023 to specify that the Residential Tenancies Act 2010 and the Residential Tenancies Regulation 2019 do not apply to a head lease granted by the NSW Reconstruction Authority to a social housing provider to facilitate the use of a residential property in the reconstruction area for the purpose of social housing.
Research
This paper explores how volunteering can act as an antidote to loneliness, with a focus on practical suggestions to foster meaningful connections through volunteering.
Recent publications
Notice
The northbound lanes will be moved east onto their permanent alignment and will temporarily divert onto the northbound off-ramp into Coffs Harbour while construction of the bypass continues.
Report
This Interpretative Report has been prepared following the completion of the first year of the construction phase groundwater monitoring program undertaken from May 2025 to May 2026 for the Coffs Harbour Bypass (CHB) project.
Report
This Interpretative Report has been prepared following the completion of the first year of the construction phase surface water monitoring program undertaken from April 2025 to April 2026 for the Coffs Harbour Bypass (CHB) project.
Report
The CHB nest box program adopted a staged replacement approach under which the number of artificial hollows was initially derived using a 1:1 replacement ratio, supported by a 20% correction factor to account for the limitations of ground-based hollow counts (TfNSW, 2021).
Report
Sandpiper Ecological Surveys (Sandpiper Ecological) was engaged by TfNSW in November 2020 to provide pre-construction ecological services. These services include preparation of a NBMP, installation of artificial hollows prior to commencement of mainline clearing, and monitoring of nest box use during the construction and operational phases.